Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 10-04-2018 à 16:41
Support : support@armp.cm Plateforme : pridesoft@armp.cm
DÉLÉGUÉ DÉPARTEMENTAL DU MINMAP DE DONGA-MANTUNG
TENDER NOTICE OPEN NATIONAL INVITATION TO TENDER No. 017/ONIT/MINMAP/RDNW/DDD-M/DMDTB/2018 OF 10th  APRIL 2018 THROUGH THE EMERGENCY PROCEDURE, FOR THE CONSTRUCTION OF SOCIOE CONOMIC INFRASTRUCTURESRELATING TO SOME BORDER KITS IN NWA SUB-DIVISION, DONGA-MANTUNG DIVISION, NORTH WEST REGION (LOTS 7&8
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the framework of the execution of the 2018 state budget, the Slate of Cameroon represented by the Divisional Delegate of Public contracts for Donga-Manlung Division hereby launches an Open National Invitation to Tender, through the Emergency procedure for the construction of socioeconomic infrastructures relating to some border kits in Nwa Sub- Division, Donga-Mantung Division, North West Region (lots 7&8)

2.Consistance des prestations New(Additif)

The services involved in this invitation to tender shall require the construction of socioeconomic infrastructures relating to some border kits in Nwa Sub-Division, Donga-Mantung Division. North West Region (lots 7&8).

3.Cout Prévisionnel New(Additif)

The estimated cost after preliminary studies for each lot stands at the following, all taxes inclusive.

Lot

Subject

Locality

Amount

7

Construction of a Toilet Block in GSS SIH

SIM, Nwa Sub-Division, D/M Division

 5,000,000FCFA

8

Construction of a block of two (02) Classrooms at GSS
Sabonqari

SABONGARI, Nwa Sub-Division,D/M Division

18,200,000FCFA

 

4.Allotissement New(Additif)

 The works are in two (02) lots and any potential bidder may go in for all two (02) lots as follows;

Lot

Subject

Locality

BUDGET HEAD

5

Construction of a Toilet Block in GSS SIM

SIM, Nwa Sub-Division, D/M Division

94/51 94 709 07110000 2209

6

Construction of a block of two (02) Classrooms at GSS Sabonqari

SABONGARI, Nwa Sub-Division,D/M Division

 

5.Participation et origine New(Additif)

Participation is open under the same conditions to all Cameroonian Companies and business concerns that have proven experience in the field of building construction and civil engineering, In general, and who are not currently suspended from public procurement.

6.Financement New(Additif)

The said works shall be financed as per the programmed budget of the 2018 Public Investment Budget (PIB 2018) of the Republic of Cameroon under the Ministry of Economy, Planning and Regional Development assigned to the Divisional Delegate of MINEPAT for
Donga-Mantung.

7.Consultation du Dossier New(Additif)

The Tender documents may be consulted and obtained immediately after publication of this Invitation to tender from the Services of the Contracting Authority (Service in charge of the award of contracts) during working hours at the Divisional Delegationof Public Contracts DONGA-MANTUNG.

8.Acquisition du Dossier New(Additif)

The Tender file may be obtained from the Divisional Delegation of Public Contracts DONGA-MANTUNG Tel: 237, 677412886 as soon as this notice is published against payment of anon-refundable sum of Forty Thousand (40,000Fcfa), CFA francs, and payable at any Public Treasury or the Municipal Treasury of NWA Council.

9.Remises des offres New(Additif)

Each bid drafted in English or French shall be signed by the bidder or by a duly authorized representative and presented in seven (07) copies including one (01) original and six (06) copies marked as such. These shall besubmitted in one sealed external envelope containing three (3) internal envelopes; (A: Administrative File. B: Technical File, C: Financial File). The sealed external envelope shall
bear no information about ttie enterprise, and should reach the Divisional Delegation of Public Contracts for Donga-Mantung, service for the award of Contracts, not later than 10:00am on 2nd May 2018, and should carry the inscription:

OPEN NATIONAL INVITATION TO TENDER No. 017/ONIT/MINMAP/RDNW/DDD-M/DMDTB/2018 OF 10th APRIL 2018 THROUGH THE EMERGENCY PROCEDURE, FOR THE CONSTRUCTION OF SOCIOECONOMIC INFRASTRUCTURES RELATING TO SOME BORDER KITS IN NWA SUB-DIVISION, DONGA-MANTUNG DIVISION, NORTH WEST REGION (SPECIFY THE LOT)

"To be opened only during the bid-opening session"

In case of any ambiguities or differences, only the original shall be considered authentic.
N/B: Any bidder who may go in for more than one lot is required to submit only one Administrative file and separate technical and
financial files for each lot, but will make sure that the Administrative file is found in the lot that will be opened first.

10.Delai de Livraison New(Additif)

The maximum duration of execution provided for by the Contracting Authority shall be four calendar (04) months (120 calendar days)per lot, as from the date of notification to the contractor to start work.

11.Cautionnement Provisoire New(Additif)

Each bidder must include in his administrative documents, abid bond issued by afirst-rate banking establishment approved by
the Ministry in charge of finance - the list of which is found in document No. 12 of the Tender File, whose amount is as follows, and valid for thirty (30) days beyond the deadline of validity of bids. Bid bonds for unsuccessful bidders shall be withdrawn not later than fifteen (15) days after the award of the contract and those of successful bidders shall be retained until the required Performance Guarantee for good execution is provided.

Lot

Subject

Amount

BID BOND

TENDER FEE

7

Construction of a Toilet Block in GSSS

 5000,00,000 FCFA

100,000 FCFA

40,000FCFA

8

Construction of a block of two (02) Classrooms at GSS Sabonqari

 18,200,000 FCFA

360,000 FCFA

12.Recevabilité des Offres New(Additif)

At the risk of being rejected, only originals or true copies certified by the issuing service or Administrative Authorities (Senior Divisional Officer. Divisional Officers) must imperatively be produced in accordance with the Special Regulations of the Invitation to
Tender. They must obligatorily be not older than three (3) months as at the date of submission of bids. Any bid not in compliance with the prescriptions of the Tender File shall be declared inadmissible. This refers especially to the absence of a bid bond issued by a first-rate bank approved by the Minister In chargeofFinance..

13.Ouverture des Plis New(Additif)

Bids shall be opened by the Divisional Tenders Board for Donga-Mantung in a single phase on the 2nd May 2018 at 11 am local time for all lots, lot 2,3, and 4lot in that order in the conference hall of the Divisional Delegation of Public Contracts Donga Mantung.
Only bidders or their authorized representatives having a perfect knowledge of the file may attend the bid opening session. Any bid which shall not comply with the requirements of the tender file shall be rejected. Bids shall be opened and assessed in a single (01) phase of two stages where:-
a) Stage 1 shallinvolve:
i) Opening and appraisal of validity, authenticity and completeness
ii) Opening of envelopes containing technical documents to appraise and evaluate technical proposals
NB: Any bids which shall not obtain 80% score in the technical evaluation shall simply be eliminated.
b) Stage II Opening of financial offers to appraise proposed amount for the project.

14.Critères d'évaluation New(Additif)

 Evaluation criteria; The evaluation of bids shall be carried out in three stages:
> 1st Stage: verification of the conformity of each administrative document;
> 2nd Stage: Evaluation of technical bids;
> 3rd Stage: Analyses of Financial bids.
The criteria of evaluation shall be as follows:
-Elimlnatory criteria

  • Absence of a document in the administrative file;
  • Bids submitted after the deadline for submission;
  • Deadline of execution more thanthe prescribed;
  • False declaration or falsified documents;
  • External envelope bearing identification marks of the Bidder;
  • Absence of or insufficient bid bond;
  • Omission of a quantified task on the bill of quantities and cost estimates
  • Enterprise with an abandoned or overdue contracts beyond contractual deadline.
  • Failure to obtain at least 80% in the evaluation of the Technical proposal.
  • Any bidder who has been suspended from public procurement

Main Qualification criteria: The criteria relating to the qualification of candidates could indicatively be on the following:
• Financial situation
• Experience
• Personnel

• Equipment.
• Methodology/organization of the site
• A report of site visit

15.Attribution New(Additif)

The evaluation shall bedonein a purely binary manner. YES or NO. The Contract shall be avifarded tothe bidder whose bid is in conformity with the dispositions of the Tender File and on the basis of the lowest bid and technical quality, refer article 33 of the Public Contracts
Code.

16.Durée Validité des Offres New(Additif)

The bidders shall remain committed to their bids during a period of (ninety) 90 days from the deadline set for the submission of bids.

17.Renseignements Complémentaires New(Additif)

Complementary technical information may be obtained every day during working hours from the Divisional Delegation of Public Contracts for Donga Mantung Division (Service ofContracts Award, Tel: 677 412 886).

AMENDMENT TO THE INVITATION TO TENDER: The Delegated Contracting Authority reserves the right, if need be. to subsequently amendthis invitation to tender in conformity with the Public Contracts Code.

NKAMBE Le 04-04-2018
Le DÉLÉGUÉ DÉPARTEMENTAL
MUMA Epse MINDJO Magdaline MANKA MUMAH