1 | Participation et origine | |
Au lieu de ... N/A |
||
Lire plutot
|
2 | Consultation du Dossier |
Au lieu de ... Invited eligible Bidders may obtain further information from Kumbo council Building, Cell Phone: +237670003577, PO BOX: 03, Kumbo; and inspect the bidding document during office hours, Monday to Friday between 9am and 3pm (GMT+1). |
|
Lire plutot All bids will be accepted without presentation of any receipt, as the Request for Quotation is obtained free of charge from Kumbo Council and PROLOG Office. |
3 | Critères d'évaluation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Au lieu de ... Quotations will be evaluated to ensure the technical proposal's compliance. · Verification that the Quotation Letter is properly completed, dated, and signed with the signatory's name and title; · Verification that the Unit Price Schedule and the Quantitative and Descriptive Quote are duly completed, dated, and signed;
Evaluation of the technical qualification of each admissible bid according to the bid evaluation grid; [Insert the following if there are multiple lots: “Quotations will be evaluated lot-wise, taking into account discounts offered, if any, after considering all possible combination of lots”. EVALUATION GRID
NB: Only bids with a total of 12 out of 15 yes votes will be accepted for the next stage of the procedure.
· · Preparation of a summary table of quotations based on the amounts corrected for any arithmetic errors, listed in ascending order. For the purposes of evaluation and comparison, the currency(ies) of the quotations must be converted into the same currency. The currency to be used for comparison purposes to convert the proposed prices, expressed in various currencies, into the comparison currency at the selling exchange rate will be the following: CFA franc (XAF). The source of the exchange rate is the Bank of Central African States (BEAC). The exchange rate date is: twenty-eight (28) days before the date of submission of offers. (NB: If the reference currency is not quoted on this date, the exchange rate will be that of the last previous day quoted.). . For technically compliant Quotations, the total evaluated prices, excluding provisional sums and any provision for contingencies, but including work in-house when their prices are established competitively, will then be compared to determine the lowest evaluated price(s). |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lire plutot
|