1. The Government of Cameroon has received funding from the World Bank to finance the cost of the Local Governance and Resilient Communities Project (PROLOG). As part of its implementation, PROLOG has signed an agreement with ALOU COUNCIL (PROLOG ALOU COMMUNITY INVESTMENT-SUPPORT GRANT AGREEMENT, LEBIALEM DIVISION, SOUTH-WEST REGION) to build community infrastructure.
2. As part of the agreement, financing for the construction of a reinforced concrete bridge (8m length, 5,4m width and 3m high) Over Nchie River, Alou Council, Lebialem Division, South-West Region, for a lead time of ninety (90) calendar days.
The Mayor of ALOU Council now invites quotations from contractors for the Works described in Annex 1: Works Requirements, attached to this RFQ. As soon as the RFQ is published, the tender’s file will be made available to all bidders, either at their request to the ALOU Council (Employer) or the PROLOG PMU/RCU
1. The Contractor shall also fill in its rates and prices for all items of the Works described in the attached Bill of Quantities. Items against which no rate or price is entered by the Contractor will not be paid for by the Employer when executed and shall be deemed covered by the rates for other items and prices in the Bill of Quantities.
The rates and prices shall include all duties, taxes, and other levies payable by the Contractor under the Contract, as of the date 7 (seven) days prior to the deadline for submission of quotations
Local Governance and Resilient Communities Project (PROLOG)
1. Quotations shall be submitted in the form attached at Annex, in seven (07) copies (including one (01) original and six (06) copies plus a USB key containing the digital PDF and editable version), to the above address, in a sealed envelope marked:
“Request for Quotations N°004/BIS/RFQ/MAYOR/AC/ACITB/PROLOG/2026 OF 11/11/2026 concerning the construction of a reinforced concrete bridge (8m length, 5,4m width and 3m high) over Nchie River, Alou Council, Lebialem Division, South-West Region
NOT TO BE OPENED UNTIL THE COUNTING SESSION”
2. The deadline for submission of Quotations is the 02/12/2026 at 10 am.
1. Quotations shall be submitted in the form attached at Annex, in seven (07) copies (including one (01) original and six (06) copies plus a USB key containing the digital PDF and editable version), to the above address, in a sealed envelope marked:
“Request for Quotations N°004/BIS/RFQ/MAYOR/AC/ACITB/PROLOG/2026 OF 11/11/2026 concerning the construction of a reinforced concrete bridge (8m length, 5,4m width and 3m high) over Nchie River, Alou Council, Lebialem Division, South-West Region
NOT TO BE OPENED UNTIL THE COUNTING SESSION”
2. The deadline for submission of Quotations is the 02/12/2026 at 10 am.
1. The quotations shall be valid until ninety (90) days
1. Quotations shall be submitted in the form attached at Annex, in seven (07) copies (including one (01) original and six (06) copies plus a USB key containing the digital PDF and editable version), to the above address, in a sealed envelope marked:
“Request for Quotations N°004/BIS/RFQ/MAYOR/AC/ACITB/PROLOG/2026 OF 11/11/2026 concerning the construction of a reinforced concrete bridge (8m length, 5,4m width and 3m high) over Nchie River, Alou Council, Lebialem Division, South-West Region
NOT TO BE OPENED UNTIL THE COUNTING SESSION”
The opening of the quotations will take place at the former Alou Council Hall, located at Madagascar Quarter, Dschang on 02/12/2026 at 11 am, local time, in the presence of the tenderers or their representatives, by the Internal Tender Board
1. The quotations will be evaluated to determine substantial responsiveness of the technical proposal.
ü Check that the Letter of Quotation is properly completed, dated and signed with the name and title of the signatory;
ü Verification that the Unit Price Schedule and Detailed and Quantitative Specifications have been duly completed, dated and signed.
ü Assessment of the technical qualification of each admissible tender in accordance with the tender evaluation grid.
TENDER EVALUATION GRID
|
No |
Designation |
BINARY NOTATION |
|
1 |
Presentation of the Offer |
|
|
Compliance with the order prescribed in the RFQ and dividers |
Yes/No |
|
|
Legibility and pagination |
Yes/No |
|
|
2 |
Experience of the bidder |
|
|
Two references in the execution of works contracts |
Yes/No |
|
|
One reference similar to the mission |
Yes/No |
|
|
3 |
Staff quality |
|
|
a) Works Superintendent / Site Manager |
|
|
|
At least Master Civil engineer or Rural Engineering Engineer or Hydraulic and Infrastructure Engineer or equivalent (copy of the diploma) |
Yes/No |
|
|
Curriculum Vitae of the Mission Manager, dated and signed |
Yes/No |
|
|
At least 8 years’ experience in similar works |
Yes/No |
|
|
b) Principal Foreman |
|
|
|
At least principal technician in civil engineering or rural engineering or equivalent (copy of the diploma) At least principal technician or HND in civil engineering of rural engineering or equivalent (copy of the diploma) |
Yes/No |
|
|
Curriculum Vitae, dated and signed |
Yes/No |
|
|
Seniority ≥ 5 years in a similar field |
Yes/No |
|
|
c) Earthworks and Road Team Leader |
|
|
|
At least CAP level in construction (or equivalent) (copy of the diploma) |
Yes/No |
|
|
Curriculum Vitae, dated and signed |
Yes/No |
|
|
Seniority ≥ 3 years in a similar field |
Yes/No |
|
|
|
d) Geotechnical Laboratory Technician / Crew Chief |
|
|
|
At least GCE Ad level in construction (or equivalent) (copy of the diploma) |
Yes/No |
|
|
Curriculum Vitae, dated and signed |
Yes/No |
|
|
Seniority ≥ 5 years in a similar field |
Yes/No |
|
4 |
Construction equipment |
|
|
List of small items of equipment appropriate to the task (photocopies of purchase invoices must be provided) |
Yes/No |
|
|
5
|
Work execution methodology |
|
|
Detailed technical note on the organization of the work |
Yes/No |
|
|
Description of the socio-environmental protection rules |
Yes/No |
|
|
Detailed work schedule with deadlines ≤ one hundred twenty (120) days |
Yes/No |
|
|
6 |
Special technical specifications, initialled on each page, dated, and signed on the last page |
Yes/No |
|
7 |
Environmental and social clauses, initialled on each page, dated, and signed on the last page |
Yes/No |
|
8 |
Special Administrative Conditions initialled on each page, dated, and signed on the last page |
Yes/No |
|
|
Total of “Yes” |
_____/23 |
Note: Only tenders with a total of 20 “Yes” votes out of 23 will be admitted to the next stage of the procedure.
ü Checking arithmetic operations, multiplying unit prices by quantities where necessary and using the price in words to make any necessary corrections;
Drawing up a summary table of Quotations based on the amounts corrected for any arithmetical errors, listed in ascending order
1. The Contract will be awarded to the Contractor who meets the eligibility requirements in accordance with the RFQ, offers the lowest evaluated price/s, offers a technically compliant quotation, and guarantees completion of the Works by the specified date.
1. The quotations shall be valid until ninety (90) days after opening the tenders
1. The Employer shall publish a contract award notice on its website with free access, if available, or in a newspaper of national circulation or UNDB online, within 15 (fifteen) days after award of contract. The information shall include the name of the successful Contractor, the Contract Price, the Contract duration, summary of its scope and the names of the Contractors and their quoted and evaluated prices.