The Mayor WIDIKUM / BOFFE Council, the Delegated Contracting Authority, on behalf of the Republic of Cameroon, hereby launches an open invitation to tender, emergency procedure for the Construction of a Block of Two Classrooms in G.S Widikum, MOMO Division, North West Region. Divided into two lots as follows.
The works include the following:
Lot: |
Name of project |
Amount of project |
Amount of bid bond |
Cost of tender file : |
SINGLE |
G.S WIDIKUM |
18 000 000F CFA |
360 000F CFA |
20 000F CFA |
Lot: |
Name of project |
Amount of project |
Amount of bid bond |
Cost of tender file : |
SINGLE |
G.S WIDIKUM |
18 000 000F CFA |
360 000F CFA |
20 000F CFA |
Participation is open under the same conditions to all Cameroonian companies and business concerned that have proven experience in the field of building construction and civil engineering in general.
The works, subject of this invitation to tender, shall be financed by the Public Investments Budget MINEDUB 2019.
The tender file may be consulted at the WIDIKUM / BOFFE Mayor’s office (technical service) during working hours, as soon as this tender notice is published.
The tender file may be acquired from the WIDIKUM / BOFFE Council upon presentation of a non refundable treasury receipt of 20 000 (twenty thousand) FCFA. Such a receipt shall identify the payer as representing the company that wants to participate in the tender.
13th August 2019 at the same time.
The maximum execution deadline shall be three (03) calender months, including the rainy season and other vagaries, with effect from the date of notification of the administrative order of work commencement.
Lot: |
Name of project |
Amount of project |
Amount of bid bond |
Cost of tender file : |
SINGLE |
G.S WIDIKUM |
18 000 000F CFA |
360 000F CFA |
20 000F CFA |
The bids not respecting the separation mode of the financial bid from the administrative and technical bids shall be rejected.
Any bid not in conformity with the prescription of this tender notice and tender file shall be declared inadmissible. Especially the absence of a bid bond of a first rate bank approved by the Ministry of Finance and valid for a period of thirty (30) days shall be rejected.
Least they are rejected, only the originals or certified true copies by the issuing service or administrative authorities of the administrative documents are accepted. They must obligatorily not be older than three (03) months and must be valid during the bid opening session.
The opening of the bids in one phase shall be done on 24/07/2019 at 11a.m in the Conference Hall of the WIDIKUM / BOFFE Council Hall by the competent tender board.
Only bidders may attend or be duly represented by a person of their choice, who has full knowledge of the file and mandated in that capacity.
Evaluation of the bids
The evaluation of the bids shall be done in three (03) steps:
The criteria of evaluation are the following:
-Eliminatory criteria
- Administrative documents
- Technical file
- Financial offer
Essential criteria:
The technical offer of the bidder shall be assessed along the following lines:
S/N |
Designation |
MARKS |
01 |
General Presentation of the offer: Document spirally bound, colour sheets separation, table of content, presentation of documents in the order given in this tender file, quality of document. |
01 |
02 |
Quality of Requested staff: Qualifications,experience of personnel affected to the project, CV, NIC and attestation of availability signed and dated. |
05 |
03 |
Technical equipment/material affected to the project: The company should justify the property of the necessary material to the execution of works. |
01 |
04 |
Reference of the enterprise:
|
02 |
05 |
Presence of the methodology of work execution |
04 |
06 |
Presence of the prefinancing capacity |
01 |
The note of the technical offer will be gotten by addition of marks for every criteria. Only the technical offer having gotten an equal or superior note to 80% of YES will be kept for the financial evaluation.
The jobbing order shall be awarded to the bidder whose bid is in conformity with the dispositions of the tender file and on the basis of the lowest bid and technical quality. (See article 99 of the public contracts code).
The bidders shall remain committed to their bids during a period of (ninety) 90 days from the deadline set for the submission of bids.
Complementary technical information may be obtained every day during working hours from the Divisional Delegation for Public Works in Momo