Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 05-07-2023 à 14:02
Support : support@armp.cm Plateforme : pridesoft@armp.cm
SOUTH WEST REGIONAL EXECUTIVE COUNCIL
Dear Sirs, Kindly cause the following to be read over your radio network as often as possible: "The President of the South West Regional Executive Council (project owner), informs the public in general and contractors concerned in particular that the undermentioned contracts funded by the 2023 budget of the South West Regional Assembly, have been awarded to the contractors hereafter mentioned:
Source de financement

S/N

CONTRACT

COMPANY

AMOUNT
FCFA (ATI)

EXECUTION
TIME

1,

N°031/ONIT/

GEO SOLUTIONS

 

 

 

SWR/SWRA/ITB/BUEA/2023... OF

LTD

 

 

 

08/05/2023

CONSULTANCY

 

 

 

FOR THE CONSTRUCTION OF TWO

PMB:153 LIMBE

39 970 328

4 MONTHS

 

ELECTRIC POWEREDBOREHOLES WITH

TEL:679 672 444

 

 

 

AN OVERHEAD-TANK AND STAND TAPS

 

 

 

 

AT AKWA I AND GOVERNMENT

 

 

 

 

TEACHERS TRAINING COLLEGE (GTTC)

 

 

 

 

AKWA-BAKASSI IN NDIAN DIVISION

 

 

 

2

N°032/ONIT/

 

 

 

 

SWR/SWRA/ITB/BUEA/2032... OF

MAC-DS (LOT 1)

16 800 000

 

 

08/05/2023

PMB:147 TOMBEL

LOT 1

3 MONTHS

           

 

 

FOR
THE CONSTRUCTION OF A BLOCK OF
TWO CLASSROOMS EACH IN SOME
SECONDARY SCHOOLS IN THE SOUTH
WEST REGION IN TWO (02) LOTS
BY EMERGENCY PROCEDURE

TEL: 678 131 554 BASCAM (LOT 2) PMB 129 MAMFE TEL:673 538 447

19 668 833
LOT 2

 

 

  1. 3.  

NO 035/ONIT/SWR/ SWRA/ITB/BUEA
/2023 OF 26/05/2023
FOR
THE CONSTRUCTION OF A SOLAR
POWERED BOREHOLE WITH
OVERHEAD TANK AT KONYE TOWN IN
MEME DIVISION; SOUTH WEST REGION.
(BY EMERGENCY PROCEDURE)

Al GROUP
PMB 23
MUNDEMBA
TEL: 677 727 372

16 994 900

3 MONTHS

  1. 4.  

- NO 036/ONIT/SWR/SWRA/ITB/BUEA

/2023 OF 26/05/2023

FOR

THE CONSTRUCTION OF SOLAR
POWERED BOREHOLE AT MBINJONG
WITH AN OVERHEAD TANK IN UPPER
BAYANG SUB-DIVISION, MANYU
DIVISION (BY EMERGENCY
PROCEDURE)

YAHWAH JIREH
PMB: 129 MAMFE

673 538 447

21 000 000

3 MONTHS

5,  

NO 037/0 NIT/SWR/SWRA/ITB/BUEA
/2023 OF 26/05/2023
FOR
THE CONSTRUCTION OF SOLAR
POWERED BOREHOLE WITH AN
OVERHEAD TANK AT MFAITOK II MILE
18; IN MAMFE CENTRAL SUB-DIVISION,
MANYU DIVISION. (BY EMERGENCY
PROCEDURE)

VISIONARY
TRADING AND
CONSTRUCTION
SERVICE MAMFE

PO BOX 132
MAMFE

Tel: 675 621 483

19 273 157

3 MONTHS

 

6,  

NO 038/ONIT/SWR/SWRA/ITB/BUEA
/2023 OF 26/05/2023
FOR THE SUPPLY AND INSTALLATION
OF 10 SOLAR STREET LIGHTS IN
BAKEBE VILLAGE IN MANYU DIVISION
(BY EMERGENCY PROCEDURE)

ETS SAMISCO PO BOX 464 BUEA TEL: 675 589 154

16 501 755

3 MONTHS

7,  

NO 039/ONIT/SWR/SWRA/ITB/BUEA
/2023 OF 26/05/2023
FOR THE SUPPLY AND INSTALLATION
OF 10 SOLAR STREET LIGHTS IN EFONG
LEBIALEM DIVISION
(BY EMERGENCY PROCEDURE)

FUODEM
ENTERPRISE

PMB: 78, MENJI

16 950 003

3 MONTHS

           


Successful bidders have been given a maximum of fifteen (15) working days from the date of signature of this publication to register their contracts or jobbing orders. Beyond this deadline, the project owner shall reserve the right to conceal the award decision after this publication remains unheeded. In that case, the bid bonds shall be forfeited and the contracts awarded to the second place bidders. Unsuccessful bidders have a maximum of fifteen (15) days to withdraw their bids from the cabinet of the President of the South West Regional Executive Council (1st door on the left), failure which they will be destroyed without any grounds for complaint

BUEA Le 27-06-2023
Le PRÉSIDENT
BAKOMA ELANGO Zacheus