Construction, Supply & Installation of two Semi Industrial Oil Palm Processing Units at Bombe Bakundu & Bachuo Akagbe of the South West Region.
NCB Reference N° 031/2021/NCB/STB/CCCM-AVAIVDP of 12/05/2021
LOT NO |
AMOUNT IN F CFA |
LOT I |
13,900,000(Thirteen million vine hundred thousands) |
LOT 2 |
14,200,000 (Fourteen million two hundred thousands) |
LOT |
DIVISI |
SUB |
COMMU |
DESCRIPTION OF THE WORKS |
DURAT |
Identif |
ON |
DIVISIO N |
NITY |
|
ION III Months |
Numb er |
|
|
|
|
|
1 |
Meme |
Mbonge |
Bombe |
The works to be executed are as follows: |
16 |
|
|
|
Bakundu |
- Preliminary works which include improvement of the access road and construction of a box culvert to the project site and bulldozing of the site |
|
|
|
|
|
- Construction of metallic portal frame for the mill structure as detailed in the bidding document |
|
|
|
|
|
- Supply & installation of machinery /equipment as |
|
|
|
|
|
detailed in the bidding document - Construction of the mill office block as detailed in the bidding document - Construction of a borehole for the water supply system as detailed in the bidding document - Construction & installation of oil storage tanks as detailed in the bidding document - Construction of a generator house as detailed in the bidding document -Installation of electric power substation (transformer station as specified in the studies presented by the Electricity Corporation ENEO) F & P Transformer H16- 160KVA-30KV/B2. The distance from the site to the High Tension Line is 25m from the site -Training of mill staff, production of operations/ management manuals and follow up during the guarantee period |
|
2 |
Many u |
Upper Bayang |
Bachuo Akagbe |
The works to be executed are as foliows: - Preliminary works which include improvement of the access road and construction of a box culvert to the project site and clearing of the site - Construction of metallic portal frame for the mill structure as detailed in the bidding document - Supply & installation of machinery /equipment as detailed in the bidding document - Construction of the mill office block as detailed in the bidding document - Construction of a borehole for the water supply system as detailed in the bidding document - Construction & installation of oil storage tanks as detailed in the bidding document - Construction of a generator house as detailed in the bidding document - Installation of electric power substation (transformer station as specified in the studies presented by the Electricity Corporation ENEO) F & P Transformer H16- 160KVA-30KV/B2. The distance from the site to the High Tension Line is 150m from the site -Training of mill staff, production of operations/ management manuals and follow up during the |
16 |
3. Bidding will be conducted through the National Competitive Bidding (NCB) procedures
as specified in IsDB's Guidelines: Procurement of Goods. Works and related services under Islamic Development Bank Project Financing April 2019 and is open to all eligible bidders as
defined in the Procurement Guidelines. In addition, please refer to paragraphs 1.18 -21 setting forth IsDB's policy on conflict of interest.
16 MONTHS
Agricultural Infrastructure and Value Chain Dcvelopment Project
Attn: Dr. Besong Ntui OGORK, Project Coordinator
AIVDP, SOWEDA Complex, Adjacent BICEC Bank
P.O Box 336, Buea, Republic of Cameroon
Tel: 237 233323411/237 679 82 44 48
Fax: 237 233323412
E-mail: aivdp.bueeieemail.com/ aivdp-bueaghotiiiiii-eo
Web site: www.soweda.org