Delegation of MINEPIA South West by emergency procedure. This involves the realisation
of the tasks outlined in the bills of quantities and cost estimates and elaborated in the
special technical clauses: The works comprise notably:
Preparatory works including site installation;
Earth works;
Foundation works;
Ground floor masonry elevation works only
Electrical air-conditioning works (General installation of electrical, air-conditioning
and computer schemes, diverse wall sockets, protection, etc) ;
Plumbing works (General installation(water supply and waste water pipes));
The estimated cost after preliminary studies stands at Seventy Five million (75 000 000) FCFA all taxes inclusive.
Participation is opened under the same conditions to ail Camer0Onian Companies and business concerns that have proven experiences in the field of building construction and civil engineering in general and who are not in a Period of suspension by the authority in earge of public contracts
Works which formed the subject of this invitation to tender shall be financed by the PUBLIC INVESTMENT BUDGET of MENA, 2022 financial year: Exp. Authorization no: 1X0440; IMPUTATION: 56 31 059 01 4419190-523112 951.
The tender file may be consulted during working hours at the Governor's Office (located above the D.O's Office), precisely at the office of the Secretary of the Regional Tenders Board, door No.14 with Tel: 233 32 25 07 as soon as this notice is published.
The tender file may be obtained at the Governor's Office, at the office of the Secretary of the Regional Tenders Board, door No.14; Tel. 233 32 25 07 as soon as this notice is publist:ed and upon presentation of a non-refundabfe treasury receipt (payable at the Regional Treasury Buea) bearing the amount of twenty five thousand (,60 000) FCFA. Such a receipt shall identify the concerned bidder.
Each bid drafted in English or French shall be signed by the bidder or by a duly authorized representative and presented in seven (07) copies including the original and six (06) copies marked as such These shah' be submitted in one sealed pack containing three (3) envelopes; (A: Administrative file, B: Technical file, C: Financial file). The sealed pack shall bear no information on the enterprise, and should reach the Governor's Office in Buea.at the office of the Secretary of the Regional TendersBoard, door No.14; latest the 05 MARS 2022 at 12:00
The maximum duration of execution provided for by the Delegated Contracting Authority shall be four (04) months, as from the date of notification of the service order to start work
Les offres devront être accompagnées d'un cautionnement provisoire (garantie bancaire de soumission' établi, selon le modèle indiqué dans le dossier d'Appel d'Offres, par un établissement bancaire agrée par le Ministère des Finances et d'un montant de :
Lot |
Désignation |
Localité |
Cautionne |
Achat DAO |
Uni |
LES TRAVAUX DE CONSTRUCTION REGIONAL DU MINEPIA SUD OUEST |
BUEA |
1,500,000 |
60,000 |
Each bid drafted in English or French shall be signed by the bidder or by a duly authorized representative and presented in seven (07) copies including the original and six (06) copies marked as such These shah' be submitted in one sealed pack containing three (3) envelopes; (A: Administrative file, B: Technical file, C: Financial file). The sealed pack shall bear no information on the enterprise, and should reach the Governor's Office in Buea.at the office of the Secretary of the Regional TendersBoard, door No.14; latest the 05 MARS 2022 at 12:00
The opening of the bids in one phase shall be done on 05 AVR 2022 at 1:00 PM prompt local time in the Conference Hall of the South West Governor's Office by the South West Regional Tenders Board.
Only bidders may attend or be duly represented by a person of their choice, who has a full knowledge of the file and mandated in that capacity
Absence of bid bond;
False declaration or falsified documents;
Omission of a quantified task on the bill of quantities and cost estimates;
Enterprise with an abandoned contract or uncompleted project (above 10% lateness penalties
without due justification)in the South west Region;
Non satisfaction of at least 75% of the main qualification criteria.
14.2. Main qualification (essential) criteria: The evaluation of the bids shall be done on predefined technical criteria following the binary process ('Yes' or `No'). The criteria relating to the qualification of candidates will indicatively be on the following:
- General Presentation, compliance with the model bid. |
Yes / No |
- Methodological approach, Organisation and relevance of proposed solutions; |
Yes / No |
- References of the bidder (at least two (02) similar projects for the last five years)(attach proof) |
Yes / No |
- Availability of material and essential equipment |
Yes / No |
- Personnel to be mobilised (qualification and experience of key members of personnel). |
Yes / No |
-Financial capacity or Access to credit or other financial sources of at least four million (4,000,000 FCFA); |
Yes / No |
- Execution time limit |
Yes / No |
The contract shall be awarded to the bidder whose bid is in conformity with the provisions of the tender file and on the basis of the lowest financial bid and technical quality, in accordance with article 99 of the public contracts code. That is, it shall be awarded to the bidder with a satisfactory technical score and the lowest financial offer.
The bidders shall remain committed to their offers/bids for a period of ninety (90) days from the deadline set for the submission of bids.
Complementary technical information may be obtained during working hours on weekdays from the office of the Secretary of the Regional Tenders Board at the Governor's Office, Tel 233 32 25 07.