| INTITULE DU PROJET | MONTANT TTC (FCFA) | DELAI | ADJUDICATAIRE |
| CONSTRUCTION D’UN BLOC DE DEUX SALLES DE CLASSE AVEC DEUX BUREAUX AU CES DE BEKA GUIWANG. LOT 3 |
30 000 000 | Trois (03) Mois | GOUPEMENT KIMBOI MINING ET ETS MIYETTI ALLAH |
| CONSTRUCTION D’UN BLOC DE DEUX SALLES DE CLASSE DEUXAVEC BUREAUX AU CETIC DE KOMBO LAKA. LOT 5 |
34 868 000 | Trois (03) Mois | ETS TG COM ET ETS MIYETTI ALLAH |