Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 24-02-2023 à 15:36
Support : support@armp.cm Plateforme : pridesoft@armp.cm
COMMUNE DE BELO
OPEN NATIONAL INVITATION TO TENDER NO 01/ONIT/MINDDEVEL/BC/BCITB/ 2023   OF 20/02/2023  FOR THE CONSTRUCTION OF A MORTUARY, BELO SUB DIVISION, BOYO DIVISION, NORTH WEST REGION
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the framework of the execution of the 2023 state budget, the State of Cameroon represented by THE MAYOR BELO COUNCIL hereby launches in an emergency procedure an open national invitation to tender for the CONSTRUCTION OF MORTUARY-BELO SUB DIVISION, BOYO DIVISION.

2.Consistance des prestations New(Additif)

The construction works subject to this invitation to tender include detail description of the items found in the bill of quantities (detail cost estimate).

  The services involved in this invitation to tender shall require THE CONSTRUCTION OF A MORTUARY IN BELO- BELO SUB DIVISION,BOYO

3.Cout Prévisionnel New(Additif)

THE ESTIMATED COST OF THE PROJECT IS 50,000,000FCFA

4.Allotissement New(Additif)

N/A

5.Participation et origine New(Additif)

Participation in this present invitation to tender is opened to all registered and qualified companies or groups of companies based in the Republic of Cameroon, with the necessary financial capability, technical and professional expertise in Public works (construction domain).

6.Financement New(Additif)

FINANCING: PIB - MINSANTE, 2023 FISCAL YEAR

7.Consultation du Dossier New(Additif)

The maximum deadline for the execution provided for by the Contracting Authority shall be three months (90 calendar days) with effect from the date of notification of the Service Order to start works

8.Acquisition du Dossier New(Additif)

N/A

9.Remises des offres New(Additif)

Each bid written in English or French shall be signed by the bidder or by a duly authorized representative and presented in seven (7) copies, that is one (01) original and six (06) copies labelled as such. These shall be submitted in one sealed pack containing three (3) envelopes, that is, Envelope A: Administrative Documents, Envelope B: Technical file and Envelope C: Financial file. The sealed pack shall bear no information about the company and shall reach the Belo Council not later than 15/03/2023at 10:am local time and note should be taken that in case of any ambiguities or differences during opening, only the original shall be considered authentic.

The sealed pack shall bear the following inscriptions:

 

 

OPEN NATIONAL INVITATION TO TENDER

NO 001/ONIT/MINDDEVEL/BC/BCITB/2023   OF 20/02/2023

 FOR THE CONSTRUCTION OF A MORTUARY IN BELO, BELO SUB DIVISION, BOYO DIVISION, NORTH WEST REGION  

 (To be opened only during bids opening session)

 

10.Delai de Livraison New(Additif)

The maximum deadline for the execution provided for by the Contracting Authority shall be three months (90 calendar days) with effect from the date of notification of the Service Order to start works

11.Cautionnement Provisoire New(Additif)

N/A

12.Recevabilité des Offres New(Additif)

Only originals or true copies certified by the issuing services of the required administrative documents (Senior Divisional Officer, Taxation Officials, etc.), including the bid bond, must imperatively be produced in accordance with the Special Tender Regulations or such bids shall be subject to rejection. They must obligatorily not be older than three (03) months. Double certification shall not be accepted. Any bid that shall not be in conformity with the prescriptions of this tender shall be declared inadmissible.

 

The provisional guarantee will be released no later than thirty (30) days after the period of bid validity for unsuccessful bidders. For the bidder who is awarded the contract, the provisional guarantee will be released after constitution of the final guarantee.

NB: The successful bidder shall during site installation present the originals of the respective documents for strict verification of their authenticity.

13.Ouverture des Plis New(Additif)

The offers shall be opened in a single phase, according to the following schedule, in the Belo Council on the 15/03/2023 at 11:am prompt. Only bidders or their authorized representatives having a perfect knowledge of the file may attend the bid opening session. Any bid which shall not comply with the requirements of the tender file shall be rejected. Bids shall be opened and assessed in a single (01) phase and two stages. 

 

a) Stage I shall involve:

i)   Opening and appraisal of validity, authenticity and completeness

ii)   Opening of envelopes containing technical documents to appraise and evaluate technical proposals

NB: Any bids which shall not obtain 75% score in the technical evaluation shall simply be eliminated.

 

b) Stage II Opening of financial offers to appraise proposed amount for the project.

 

 

14.Critères d'évaluation New(Additif)

ASSESSMENT CRITERIA: Tender conformity shall be evaluated as per the following:

A) Eliminatory Criteria.

 

-          Absence of Bid Bond (outright elimination)

-          Bids  submitted in unsealed envelopes and packs;

-          Offers (bids)  submitted after the deadline or time limit;

-          Absence of original or properly certified administrative documents,

-          Administrative documents more than 3months old;

-          Incomplete technical or financial documents;

-          Omission of unit price schedule ;

-          None justification of capacity to pre-finance ;

-          Technical and administrative evaluation mark less than 75% ;

-          False declaration or forged documents ;

-          Work supervisor of the company having less than three (03) years of experience;

-          Site Foreman having less than five (05) years of working experience;

 

B) Evaluation Criteria: The preliminary evaluation shall be the binary method (YES/NO) based on the following essential criteria:

 

CRITERA

ELEMENTS

GENERAL PRESENTATION OF THE BIDS

4 Elements

EXPERIENCE OF THE COMPANY

8 Elements

QUALITY OF PERSONNEL AND MANAGEMENT OF THE COMPANY

6 Elements

TECHNICAL EQUIPMENT

6 Elements

METHODOLOGY FOR THE  EXECUTION OF WORKS

4 Elements

TOTAL

28 ELEMENTS

NB:

- Any Bid that shall not obtain 75% evaluation shall simply be rejected.

- Details of these main qualification criteria are specified in the assessment grid found in the Special Tender Regulations (RPAO).

NB. During the opening session of bids if a document of the administrative bid is absent or noncompliant; the bidder will be given forty eight (48) hours to produce or replace said documents else will be eliminated during the evaluation of the bids. No such document will be accepted after the deadline.

15.Attribution New(Additif)

The contract shall be awarded to the lowest bidder, who fulfils the technical and administrative requirements.

16.Durée Validité des Offres New(Additif)

Any bidder may bid for and hold more than one (1) lot but in this case we have just one lot. However for reasons of assiduity, effective presence of the contracting partner and proper realization of works this must be so with different sets of personnel.

                                                                               

17.Renseignements Complémentaires New(Additif)

Additional (supplementary) technical information may be obtained during working hours from the SG Belo Council.(237) 674 71 64 29

AMENDMENT TO THE INVITATION TO TENDER: The Contracting Authority reserves the right, if warranted, to subsequently amend this invitation to tender.

BAMENDA Le 20-02-2023
Le MAYOR
NGONG ANKIAMBON Innocent