TENDER FILE N° 06/ONIT/NC/NCITB/2024 OF20/03/2024 FOR THE EXTENSION OF ELECTRICITY FROM NGEPTANG TO ETANGHECHENG AND STEPDOWN AT MEE VILLAGE, NONI SUB DIVISION, BUI DIVISION, NORTH WEST REGIONFINANCING: PIB MINEE - 2024
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the framework of 2024 Public Investment Budget, The Mayor of Nkor Council, Contracting Authority hereby launches an Open National Invitation to Tender FOR THE EXTENSION OF ELECTRICITY TO ETANGHECHENG AND STEPDOWN AT MEE VILLAGE, NONI SUB DIVISION, BUI DIVISION, NORTH WEST REGION

2.Consistance des prestations New(Additif)

Work to be done consists of

 Construction of an MV/LV single phase line on a distance of 1000m With 4x25 mm² Aluminum Twisted Cables with 7 of 11m single poles and 3 of 11m double wooden poles.
 Construction of an LV single phase line on a distance of 3.4m with 4x25mm² twisted Aluminum cable taking 49 of 9m single wooden poles and 19 of 9m double wooden polees.
 Supply and Installation of one 25KVA transformers.
 The Sundry expenses will consist of :
 Clearing and pruning 8m width on each side of the network.
 Transportation of wooden poles, materials and workers.

3.Cout Prévisionnel New(Additif)

The estimated cost after preliminary studies is 50,000,000 FCFA (fifty million FCFA)

4.Allotissement New(Additif)

The work is as follows: For the Extension of Electricity to Etanghecheng and Stepdown at Mee Village, Noni Sub Division, Bui Division, North West Region

5.Participation et origine New(Additif)

Participation to this Invitation to Tender is opened to Cameroonian enterprises that are in compliance with the Cameroon laws.

6.Financement New(Additif)

Works which form the subject of this Invitation to Tender shall be financed by the PIB MINEE 2024. Budget head number 58 32 137 01 641649 464211 851

7.Consultation du Dossier New(Additif)

The file may be consulted during working hours at the Nkor Council, Contract Award Service, as soon as this notice is published.

8.Acquisition du Dossier New(Additif)

The file may be obtained from the Nkor Council, Contract Award Service as soon as this notice is published against payment of the sum of 64 000 Francs CFA (sixty-four thousand Francs CFA), payable at the Nkor Council Treasury, representing the cost of purchasing the Tender File.

9.Remises des offres New(Additif)

Each offer drafted in English or French in 07 (seven) copies including 01 (one) original and 06 (six) copies marked as such, should reach the Nkor Council, Contract Award Service not later than 18/04/2024 at 10:00 am local time and should carry the inscription:

<< TENDER FILE N° 06ONIT/NC/NCITB/2024 OF 20/03/ 2024 FOR THE EXTENSION OF ELECTRICITY FROM NGEPTANG TO ETANGHECHENG AND STEPDOWN AT MEE VILLAGE, NONI SUB DIVISION, BUI DIVISION, NORTH WEST REGION. >>
“To be opened only during the bid-opening session”

10.Delai de Livraison New(Additif)

The maximum deadline provided by the Contracting Authority for the execution of the works forming the subject of this Invitation to tender is four (04) months

11.Cautionnement Provisoire New(Additif)

Each bidder must include in his administrative documents, a bid bond issued by a first-rate banking establishment approved by the Ministry in charge of Finance and whose list is found in document No. 12 of the Tender File, of an amount of 1000 000 (one million FCFA) and valid for thirty (30) days beyond the date of validity of bids

12.Recevabilité des Offres New(Additif)

Under penalty of being rejected, only originals or certified true copies signed by the issuing service or administrative authorities (Senior Divisional Officer, Divisional Officers) must imperatively be produced in accordance with the Special Regulations of the Invitation to Tender.
They must obligatorily not be older than three (3) months preceding the date of submission of bids or may be established after the signature of the tender notice
Any bid not in compliance with the prescriptions of the Tender File shall be rejected. This refers especially to the absence of a bid bond issued by a first-rate bank approved by the Minister in charge of Finance. .

13.Ouverture des Plis New(Additif)

The bids shall be opened in a single phase. The opening of the administrative documents, the Technical and Financial offers will take place on the 18/04/2024 at 11 AM local time, in the conference hall of the Nkor Council Internal Tenders‟ Board, by its competent Members. Only bidders may attend or be represented by duly mandated persons of their choice.

14.Critères d'évaluation New(Additif)

The bids shall be evaluated according to the main criteria as follows:

A. Eliminatory criteria

1. -Absence or non-conformity of an element in the administrative file;
2. -Deadline for delivery higher than prescribed;
3. -False declaration or falsified documents;
4. -Absence or insufficient bid bond;
5. -A bid with the external envelope carrying a sign or mark leading to the identification of the bidder;
6. -Incomplete financial file;
7. -Change of quantity or unit;
8. -Non respect of 23/27 (85%) of essential criteria;

B. Essential criteria

1- General presentation of the Tender Files;
2- Financial capacity;
3- References of the company in similar achievements;
4- Quality of the personnel;
5- Technical organization of the works;
6- Safety measures on the site;
7- Logistics;
8- Attestation and report of site visit;
9- Special Technical Clauses initialed in all the pages;
10- Special Administrative Clauses completed and initialed in all the pages.

15.Attribution New(Additif)

This evaluation will be done in a binary way (yes) or (no) with an acceptable minimum of 23/27 (85%) of the essential criteria taken in account.
The Contract will be awarded to the bidder who would have proposed the offer with the lowest amount, in conformity with the regulations of the Tender Documents and having satisfied to 100% of the eliminatory criteria and at least 23/27 (85%) of the essential criteria.

16.Durée Validité des Offres New(Additif)

Bidders will remain committed to their offers for sixty (60) days from the deadline set for the submission of tenders.

17.Renseignements Complémentaires New(Additif)

Complementary technical information may be obtained during working hours from the Nkor Council‟s Contract Award Service. Tél. : 237 679 824 918

BAMENDA Le 20-03-2024
Le MAYOR
NCHANYI NDI Germanus