Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 11-04-2024 à 16:03
Support : support@armp.cm Plateforme : pridesoft@armp.cm
SOUTH WEST REGIONAL EXECUTIVE COUNCIL
TENDER NOTICE OPEN NATIONAL INVITATION TO TENDER No. 21/ONIT/ SWR/ SWRA/1TB/BUEA/2024... FOR REHABILITATION OF MUEBAH-EBONEMIN WATER INSTALLATION, BANGEM SUBDIVISION IN KUPE MUANENGUBA DIVISION
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the framework of the Execution of the 2024 investment budget of the South West Regional Assembly, the President of the South West Regional Executive Council hereby launches an OPEN NATIONAL INVITATION TO TENDER FOR REHABILITATION OF MUEBAH-EBONEMIN WATER INSTALLATION, BANGEM SUBDIVISION IN KUPE MUANENGUBA DIVISION

2.Consistance des prestations New(Additif)

The works that are subject of the present tender consist of:

- Mobilisation and site installation  Rehabilitation of catchment  

- rehabilitation of a storage tank and treatment station

- rehabilitation of Pipelines network    

- Installation of stand taps and control chamber

- Protection and maintenance

 

 

 

 

 

 

 

 

 

  Mobilisation and site installation  Rehabilitation of catchment  rehabilitation of a storage tank and treatment station rehabilitation of Pipelines network

          Installation of stand taps and control chamber

                 Protection and maintenance

3.Cout Prévisionnel New(Additif)

The total estimated cost of all the project after preliminary studies is Twenty-four million nine hundred and ninety- five thousand seven (24 995 700) FCFA

4.Participation et origine New(Additif)

Participation is opened to all duly registered Cameroonian enterprises with the necessary technica and financial capacities who are not under suspension by the authority in charge of public contracts

 

5.Financement New(Additif)

Works which formed the subject of this invitation to tender shall be financed by the SOUTH WEST REGIONAL ASSEMBLY INVESTMENT BUDGET, 2024 financial year through budget he (imputation) N O. 220150

6.Consultation du Dossier New(Additif)

The file may be consulted during working hours at e:President of Regional Executive Council, first floor of Regional Assembly as soon as this notice is published.

7.Acquisition du Dossier New(Additif)

The file may be obtained from the same address as soon as this notice is published  against payment of twenty-fiuve thousand ( 25000 ) FCFA payable at the South West Regional Assembly Treasury.

8.Remises des offres New(Additif)

Each bid drafted in English or French in seven (07) copies comprising one (01) original and six (06) copies marked as such, should reach the Cabinet of the President of Regional Executive Council, first floor of Regional Assembly Building not later than at 10.00 a.m., local time in three (03) distinct envelopes which shall be labelled as follows: Envelop A : administrative documents;  Envelop B : technical offer;,  Envelop C: financial offer..These three (03) envelops shall be in a fourth envelope, sealed and labelled imperatively as follows:

OPEN NATIONAL INVITATION TO TENDER

NO. 21/ONIT/ SWR/ SWRA/1TB/BUEA/2024 OF 05/04/2024

FOR REHABILITATION OF MUEBAH-EBONEMIN WATER INSTALLATION,

BANGEMSUBDIVISION IN KUPE MUANENGUBA DIVISION

"To be opened only during the Bids Opening Session"

9.Delai de Livraison New(Additif)

The maximum execution deadline of the work shall be 03 (Three) months from the date o notification of Service Order for the commencement of works.

10.Cautionnement Provisoire New(Additif)

Each bidder must include in his/her administrative documents, a bid bond that respects the models of this tender file, issued by a first-rate financial establishment approved by the Ministry in charge of finance, (see list in document No. 11 of this tender file), and of an amount of Four hundred and ninety-nine thousand nine hundred and fourteen (499 914) FCFA, representing 2% of the  project amount and valid for thirty (30) days beyond the date of validity of bids. Bid bonds for unsuccessful bidders shall be withdrawn not later than fifteen (15) days after the award of the contract and that of the successful bidder shall be retained until the required performance guarantee for good execution is provided

11.Recevabilité des Offres New(Additif)

Each bid drafted in English or French in seven (07) copies comprising one (01) original and six (06) copies marked as such, should reach the Cabinet of the President of Regional Executive Council, first floor of Regional Assembly Building not later than at 10.00 a.m., local time in three (03) distinct envelopes which shall be labelled as follows: Envelop A : administrative documents;  Envelop B : technical offer;,  Envelop C: financial offer..These three (03) envelops shall be in a fourth envelope, sealed and labelled imperatively as follows:

OPEN NATIONAL INVITATION TO TENDER

NO. 21/ONIT/ SWR/ SWRA/1TB/BUEA/2024 OF 05/04/2024

FOR REHABILITATION OF MUEBAH-EBONEMIN WATER INSTALLATION,

BANGEMSUBDIVISION IN KUPE MUANENGUBA DIVISION

"To be opened only during the Bids Opening Session"

12.Ouverture des Plis New(Additif)

The bids shall be opened in a single phase. The administrative, opened on, the 29/04/2024  at 11.00 a.m., local Regional Assembly Internal Tender's Board in the conference hall, in the presence of the bidders or duly authorized representatives having full knowledge of the file (power of attorney).

13.Critères d'évaluation New(Additif)

The evaluation of bids shall be carried out in three stages:

 1st Stage : verification of the presence and conformity of each administrative document ;  2 nd Stage : Evaluation of the technical bids ;  3 rd Stage: Analyses of the financial bids. The criteria of evaluation shall be as follows:

i. Eliminatory criteria They are especially:

  Absence of bid bond,

False declaration or forged document,

  A technical score of less than 70%,

  Absence of quantified unit price,

  Incomplete administrative documents 48hrs after bid opening

ii.    Essential criteria

  General Presentation, compliance with the model bid.

  Methodological approach and relevance of proposed solutions; References of the bidder

(experience of at least three (03) years in similar works) (attach proof)

  Availability of material and essential equipment

  Experience of key supervisory staff

  Financial capacity fifteen million (15 000 OOOFCFA);

  Company Turnover twenty million (20 000 000) fcfa

  Deadline of execution

14.Attribution New(Additif)

The jobbing order shall be awarded to the bidder whose bid is in conformity with the dispositions o the tender file and on the basis of the lowest bid and technically qualified, in accordance with article 99(a) of the public contracts code. That is, it shall be awarded to the bidder with a satisfactory technical score and the lowest financial offer.

15.Durée Validité des Offres New(Additif)

Bidders will remain committed to their bids for 90 days from the deadline set for the submission of bids

Complementary technical information may be obtained during working hours from the Cabinet of the President of the South West Regional Assembly, Tel: .

16.Renseignements Complémentaires New(Additif)

Complementary technical information may be obtained during working hours from the Cabinet of the President of the South West Regional Assembly, Tel: .

BUEA Le 05-04-2024
Le ADMINISTRATEUR
BAKOMA ELANGO Zacheus