Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 26-04-2024 à 12:58
Support : support@armp.cm Plateforme : pridesoft@armp.cm
SOUTH WEST REGIONAL EXECUTIVE COUNCIL
TENDER NOTICE OPEN NATIONAL INVITATION TO TENDER 035/ONIT/SWR/SWRA/ITB/2024 OF 23/04/2024_ FOR THE MAINTENANCE OF TWO BRIDGE DECKS OVER RIVER MFU, LOT 1 (PK 13+330) AND RIVER f MFI LOT 2 (PK 14+150) ON ROAD R19 (BAKEBE - MENJI), TINTO MUNICIPALITY, MANYU [ DIVISION, SOUTH WEST REGION
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)
  1. Within the framework of the Execution of the 2024 South West Regional Assembly Investment

Budget, the President of the South West Regional Executive Council hereby launches an OPEN NATIONAL INVITATION TWENDER FOR THE MAINTENANCE OF TWO BRIDGE DECKS OVER RIVER MFU, LOT 1 (PK 13+330) AND LOT 2 (PK 14+150) ON ROAD R19 (BAKEBE - MENJI),  TINTO MUNICIPALITY, MANYU DIVISION, SOUTH WEST REGION

2.Consistance des prestations New(Additif)
  1. Installations

-      Site installation.

  1. Site preparation

-     Excavation, cleaning levelling.

iii. Drainage and canalisation

-     Cleaning and opening of river channel.

iv. Engineering structures (bridge deck)

Demolition of affected (degraded) reinforced concrete

- Ordina ry formwork.                                                                                                  

Rein forced concrete dosed at 400 kg/m3. Formwork with treated wood.

Scaffolding.                                                                                                                                     

V. Equipment - signalisation - security

Guard rail niix (pillars in concrete and galvanized iron tubes).                                                                                                                                                          
Woodull s )(des.

Maintain ol circulation.

3.Cout Prévisionnel New(Additif)

55 000 000

4.Allotissement New(Additif)

03 LTS

5.Participation et origine New(Additif)

Participation is opened to all duly registered Cameroonian enterprises with the necessary technic financial and legal capacities and who are not under suspension by the authority in charge of pub contracts.

6.Financement New(Additif)

Works which formed the subject of this invitation to tender shall be financed by the SOUTH WEST REGION. ASSEMBLY INVESTMENT BUDGET, 2024 financial years through budget head (imphtation) 

7.Consultation du Dossier New(Additif)

The tendet. file shall be consulted during working hours at the SOUTH WEST REGIONAL ASSEMBLY, precisely at the'cabinet of the President of the SOUTH WEST REGIONAL ASSEMBLY (SWRA) as soon as this notice is published.

8.Acquisition du Dossier New(Additif)

The tender file may be acquired from the SWRA at the cabinet of the President of SWREC as soon as this notice is published and upon presentation of a non-refundable treasury receipt (payable at the south west regional .tssemblY (SWRA) Treasury bearing the amount of FORTY-SIX  thousand francs (46 000) FCFA. Such a receipt shah identily the concerned bidder

9.Remises des offres New(Additif)

bid for drafted in English or French shah be presented in seven (07) copies including the original and six (U6) copies marked as such. These shall be submitted in one sealed packet containing three (3) envelopes; (A: Administrative file, B: Technical file, C: Financial file). The sealed packet should reach at the cabinet of the President of the SOUTH WEST REGIONAL ASSEMBLY (SWRA), latest the 17/5/2024 at 10:00 am local t i nre and should carry the inscription

N°036/ONIT/SWR/SWRA/ITB/2024 OF23/04/2024

THE MAINTENANCE OF TWO BRIDGE DECKS OVER RIVER MFU AND MFI LOT 1 (PK 13+330) AND LOT 2 (PK 14+150) ON ROAD R19 (BAKEBE - MENJI), TINTO MUNICIPALITY, MANYU DIVISION, SOUTH WEST REGION

10.Delai de Livraison New(Additif)

The maximum duration of execution provided for by the Contracting Authori isTHRRE (03) months. This duration is as from the date of notification of the service order to start work

11.Cautionnement Provisoire New(Additif)

 the Tender File and Each bid shah be accompanied by a bid security worth of(for lot 1) and/or 282 000 FCFA (for lot 2) which is valid for thirty (30) days beyond

ofvalidity of bids.

Uunsuccessful bidders shah be withdrawn not later than fifteen (15) days 

12.Recevabilité des Offres New(Additif)

bid for drafted in English or French shah be presented in seven (07) copies including the original and six (U6) copies marked as such. These shall be submitted in one sealed packet containing three (3) envelopes; (A: Administrative file, B: Technical file, C: Financial file). The sealed packet should reach at the cabinet of the President of the SOUTH WEST REGIONAL ASSEMBLY (SWRA), latest the 17/5/2024 at 10:00 am local t i nre and should carry the inscription

N°036/ONIT/SWR/SWRA/ITB/2024 OF23/04/2024

THE MAINTENANCE OF TWO BRIDGE DECKS OVER RIVER MFU AND MFI LOT 1 (PK 13+330) AND LOT 2 (PK 14+150) ON ROAD R19 (BAKEBE - MENJI), TINTO MUNICIPALITY, MANYU DIVISION, SOUTH WEST REGION

13.Ouverture des Plis New(Additif)

in one phase shall be done on 17/5/2024 at 11:00 am prompt local time in the Conference I lall of the REGIONAL ASSEMBLY by the REGIONAL ASSEMBLY 1NTERNAL TENDERS BOARD. ()n'y bidders may attend or be duly represented by a person of their choice, who has a full knowledge of lie file and mandated in that capacity.

14.Attribution New(Additif)

in one phase shall be done on 17/5/2024 at 11:00 am prompt local time in the Conference I lall of the REGIONAL ASSEMBLY by the REGIONAL ASSEMBLY 1NTERNAL TENDERS BOARD. ()n'y bidders may attend or be duly represented by a person of their choice, who has a full knowledge of lie file and mandated in that capacity.

15.Durée Validité des Offres New(Additif)

The bidders shall remain committed to their offers/bids for a period of ninety (90) days from the de set for the submission of bids.

16.Renseignements Complémentaires New(Additif)

Complementary technical information may be obtained during working hours on weekdays frc cabinet of the President of the SOUTH WEST REGIONAL ASSEMBLY (SWRA).

BUEA Le 23-04-2024
Le PRÉSIDENT
BAKOMA ELANGO Zacheus