Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 08-04-2025 à 17:04
Support : support@armp.cm Plateforme : pridesoft@armp.cm
SOUTH WEST REGIONAL EXECUTIVE COUNCIL
TENDER NOTICE N° 010 /ONIT/ SWR/SWRA/ITB/BUEA/ 2025... 0F 07/04/2025/THE REHABILITATION OF AN ELECTRIC POWERED BORE HOLE AT TURBURG JUNCTION-BUEA
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

The President of the South West Regional Executive Council, the Contracting Authority, hereby launches an open national invitation to tender THE REHABILITATION OF AN ELECTRIC POWERED BORE HOLE AT TURBURGJUNCTION­BUEA

2.Consistance des prestations New(Additif)

The works comprise notably:-

·      Preliminary works;

·      Drilling works;           _ _

·      Design-Cleaning and Development-Pumping test;

·      Supply and installation of an electric pump;

·      Connection to existing network

·      Construction of stand taps

·      Project sustainability.

 

3.Cout Prévisionnel New(Additif)

The estimated cost alter preliminary studies is twelve million (12 000 000) FCFA;

4.Participation et origine New(Additif)

Participation is opened to all duly registered Cameroonian enterprises with the necessary technical and financial capacities who are not under suspension by the authority in charge of public contracta

 

5.Financement New(Additif)

Works which formed the subject of this invitation to tender shall be financed by the SOUTH WEST REGIONAL ASSEMBLY INVESTMENT BUDGET, 2025 financial year through budget head (imputation)

6.Consultation du Dossier New(Additif)

The file may be consulted during working hours at cabinet of the President of Regional Executive Council, first floor of Regional Assembly Building, Buea, Service Tel: 233 32 61 86 as soon as this notice is published. It can equally be consulted online on COLEPS platform at http://www.marchespublics.cm and http://www.publiccontracts.cm, on the ARMP website (www.armp.cm) or on any other electronic means of communication indicated by the Project Owner.

7.Acquisition du Dossier New(Additif)

The file may be obtained from the same address above as soon as this notice is published against payment of the sum of 10,000 (ten thousand) francs CFA, payable at the South West Regional

___ Assrmhly-Tre-dos-sible_________________ t-o-obtain____ the el e ct-ronic-versietreft-hre-T-en-der-FiFe  by
downloading it free of charge through the addresses indicated above. However, online —submission is subject to the payment-of Tender-File-purchase fees.

8.Remises des offres New(Additif)

the submission is done electronically, the bid should be forwarded by the tenderer on the COLEPS platform or any other means of electronical communication indicated by Project Owner not later than [closing date to receive tenders] at [closing time]. A backup copy of the bid registered on USB key or CD/DVD should be forwarded in a sealed envelope with the clear and legible indication "backup copy", in addition to the above label, within the allocated deadline.

N.B : File size and format

For online bidding, the maximum sizes of the documents that will transit on the platform and constitute the tenderer's offer are the following:

·         5 MB for the Administrative file;

·         15 MB for the Technical offer;

·         5MB for the Financial offer. The following formats are accepted:

·         PDF format for text documents;

·         JPEG for images.

The applicant shall use compression software to possibly reduce the size of the files to be transmitted according to the sizes indicated above.

N.B. The original of the administrative document should be presented during online opening session.

9.Delai de Livraison New(Additif)

The maximum duration provided by the Project Owner for the execution of the works forming the subject of this invitation to tender is three (03) months. This period runs from the date of notification of the service order to start the work.

10.Cautionnement Provisoire New(Additif)

Each bidder must include in his administrative documents, a bid bond issued by a first-rate banking establishment approved by the Ministry in charge of finance and whose list is found in document No.

 

14 of the Tender File, of an amount of Two hundred and forty thousand (240 000) fcfa, valid for thirty (30) days beyond the initial date limit of validity of bids.

The bid bond provide in accordance with the Circular Letter No. 000019/LC/MINMAP of 5th of June 2024 relating to the modalities of constitution, deposit, conservation, restitution and withdrawal of bond on public contracts. The bid bod should be stamped and carry the hand written inscription from the financial institution for authentication

The absence of the bid bond issued by a first-rate bank or financial body of first category authorised by the Minister in charge of Finance to issue bonds for public contracts shall lead to the immediate rejection of the offer. A bid bond submitted but that does not have any relation with the consultation concerned shall be considered as absent. The bid bond presented by a tenderer at the bid opening session shall not be accepted

11.Recevabilité des Offres New(Additif)

the submission is done electronically, the bid should be forwarded by the tenderer on the COLEPS platform or any other means of electronical communication indicated by Project Owner not later than [closing date to receive tenders] at [closing time]. A backup copy of the bid registered on USB key or CD/DVD should be forwarded in a sealed envelope with the clear and legible indication "backup copy", in addition to the above label, within the allocated deadline.

N.B : File size and format

For online bidding, the maximum sizes of the documents that will transit on the platform and constitute the tenderer's offer are the following:

·         5 MB for the Administrative file;

·         15 MB for the Technical offer;

·         5MB for the Financial offer. The following formats are accepted:

·         PDF format for text documents;

·         JPEG for images.

The applicant shall use compression software to possibly reduce the size of the files to be transmitted according to the sizes indicated above.

N.B. The original of the administrative document should be presented during online opening session.

12.Ouverture des Plis New(Additif)

The bids shah be opened in a single phase. The administrative, technical and financial bids shah be opened

on, the -07/05/2025 at 11.00 a.m., local time by the South West Regional Assembly Internai Tender's Board in the conference hall of the Regional Assembly, in the presence of the bidders or duly authorized representatives having full knowledge of the file (power of attorney).

 

Only tenderers may attend this opening session or be represented by a single person of their choice, duly authorised, even in the case of a group of companies.

Under pain of being rejected, the required administrative documents must be submitted in originals or copies certified by the issuing service or the relevant administrative authority, in accordance with the provisions of the Special Regulations of the invitation to tender. They shall be no later than 3 (three) months old from the original deadline for the submission of tenders or must have been issued after the date of signature of the Tender Notice.

In case of absence or non-conformity of a document in the administrative file during the opening of bids, after a 48 (forty-eight) hours deadline granted by the Board, the file shall be rejected.

13.Critères d'évaluation New(Additif)

Evaluation criteria

The eliminatory criteria are the following:

-        Absence of bid bond at the opening of bids with its consignment receipt delivered by the

CDEC;

-        Failure to submit, beyond the 48 (forty-eight) hours deadline after the opening of bids, a

document of the administrative file deemed non-compliant or absent (except the bid bond); False declarations, fraudulent schemes or forged documents;

Failure to comply with 75% essential criteria (75% referring to the qualification threshold of technical bids);

Absence of the sworn statement for not having abandoned contracts during the last three

years_______ ü, llie --cruth-West-R-egi-crn,   - -

Absence of a quantified unit price in the financial offer;

i. Essential criteria

The criteria relating to the qualification-of-c-,andidates are thefollowing: Financial situation of the bidder

-        Reference of the enterprise

Personnel

Equipment

methodology and planning of execution

14.Attribution New(Additif)

The jobbing order shah be awarded to lowest bidder fulfilling the technical and financial conditions.

15.Durée Validité des Offres New(Additif)

Bidders will remain committed to their bids for ninety (90) days from the initial deadline set for the submission of bids.

16.Renseignements Complémentaires New(Additif)

Complementary technical information may be obtained during working hours from the cabinet of the President of the South West Regional Assembly

BUEA Le 07-04-2025
Le PRÉSIDENT
BAKOMA ELANGO Zacheus