OPEN NATIONAL INVITATION TO TENDER N°025/ONIT/NWRTB/GOV-NW/2026 OF 21/08/2026 FOR THE  CONSTRUCTION OF SOME BRIDGES IN BAMENDA 1 AND 2 IN TWO LOTS BY EMERGENCY PROCEDURE LOT 01(CONSTRUCTION OF THREE BRIDGES )A : 8ML BRIDGE AT BANGSHIE (KENELAR BRIDGE) AND OPENING OF 2KM ACESS ROAD ON BOTHSIDES,  A 3X3X9ML BOX  CULVERT AT  BAPTIST CHURCH AKUMBELE TO CATHOLIC CHURCH BUJONG AND OPENING OF 2KM ACESS ROAD ,6 ML BANGSHIEBRIDGE  AND OPENING OF ACESS WAY IN BAMENDA I COUNCIL AREA LOT 2 (CONSTRUCTION OF THREE BRIDGES) A 08 ML BRIDGE (LINKING NDZEMANBEAH TO NTANKAH AND A REINFORCED CONCRETE   BOX CULVERT OF 3.5M X4M X8M   LINKING NDZEMANBEAH TO ALAMATU AND A 7ML BRIDGE LINKING MBINFIBIEH -AKOKIKANG QUATER IN BAMENDA II COUNCIL AREA.
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the framework of Construction/Reconstruction of Engineering Structures, the Delegated Project Owner hereby launches an Open National Invitation to tender for the

THE  CONSTRUCTION OF SOME BRIDGES IN BAMENDA 1 AND 2 IN TWO LOTS

BY EMERGENCY PROCEDURE LOT 01(CONSTRUCTION OF THREE BRIDGES )A : 8ML BRIDGE AT BANGSHIE (KENELAR BRIDGE) AND OPENING OF 2KM ACCESS ROAD ON BOTH SIDES,  A 3X3X9ML BOX  CULVERT AT  BAPTIST CHURCH AKUMBELE TO CATHOLIC CHURCH BUJONG AND OPENING OF 2KM ACCESS ROAD ,6 ML BANGSHIEBRIDGE  AND OPENING OF ACCESS WAY IN BAMENDA I COUNCIL AREA

LOT 2 (CONSTRUCTION OF THREE BRIDGES) A 08 ML BRIDGE (LINKING NDZEMANBEAH TO NTANKAH AND A REINFORCED CONCRETE   BOX CULVERT OF 3.5M X4M X8M   LINKING NDZEMANBEAH TO ALAMATU AND A 7ML BRIDGE LINKING MBINFIBIEH -AKOKIKANG QUATER IN BAMENDA II COUNCIL AREA.

2.Consistance des prestations New(Additif)

Works comprise especially the items listed in the table below:

LOT 1 CONSTRUCTION OF SOME BRIDGES IN BAMENDA 1 COUNCIL AREA

 

1.    CONSTRUCTION OF A 8ML BRIDGE AT BANGSHIE (KENELAR BRIDGE) IN BANSHIE QUARTER  I

S/No

DESCRIPTION

 

Series 000-Installation

1

Site installations

2

mobilisation and demobilisation of equipment

3

Work execution program and as built plan

4

Geotechnical studies (evironmental studies inclusive)

 

Total installation

 

Series 100: Site preparation

101

Site clearance

102

Traffic flow (diversion of water course/road)

103

Setting out of the bridge

 

Total Site preparation

 

Series 200: General Earth works

201

Opening of 3km road on both side of the bridge

202

Excavation of trenches

203

Backfilling of excavation

204

Resurfacing of the filled accesses to the bridge with laterite from borrowed pit 1KM on both side

 

Total General Earth works

 

Series 300 -FOUNDATION- ABUTMENT- DECK- WING WALL-GUTTERS

301

Hard core

302

Lean concrete  dosed at 150Kg/m3

303

Reinforced  concrete  dosed at 350Kg/m3 for the footings

304

reinforce concrete 15cm thick  dosed at 350Kg/m3 for the bridge's raft

305

Reinforced concrete  dosed at 400Kg/m3 for abutment and wing walls

306

Reinforced concrete  dosed at 400Kg/m3 for the beam seat, slab and kerbs

307

Transitional Slab( 1mx0.1x8)cm length on both sides of the bridge

308

Archor of rods HA25 to a rock

309

Drainage material behind the abutment

 

Total Fondations- abutments- deck- wing wall

 

Series 400 - EQUIPMENT

401

Mix guard rails (concrete pillars and metallic pipes)

402

weep holes in PVC

403

Drainage pipes (PVC 100)

404

Metallic project information sign posts (type AB)

405

Round post markers (Balises) in treated Eucalyptus well seasoned wood

 

2.    CONSTRUCTION OF A 6ML BRIDGE  AT BANGSHIE IN BAMENDA I COUNCIL AREA

 

S/No

DESCRIPTION

 

Series 000-Installation

1

Site installations

2

mobilisation and demobilisation of equipment

3

Work execution program and as built plan

4

Geotechnical studies (evironmental studies inclusive)

 

Total installation

 

Series 100: Site preparation

101

Site clearance

102

Traffic flow (diversion of water course/road)

103

Setting out of the bridge

 

Total Site preparation

 

Series 200: General Earth works

201

Opening of 1km road on both side of the bridge

202

Excavation of trenches

203

Backfilling of excavation

204

Resurfacing of the filled accesses to the bridge with laterite from borrowed pit

 

Total General Earth works

 

Series 300 -FOUNDATION- ABUTMENT- DECK- WING WALL-GUTTERS

301

Hard core

302

Lean concrete  dosed at 150Kg/m3

303

Reinforced  concrete  dosed at 350Kg/m3 for the footings

304

reinforce concrete 15cm thick  dosed at 350Kg/m3 for the bridge's raft

305

Reinforced concrete  dosed at 400Kg/m3 for abutment and wing walls

306

Reinforced concrete  dosed at 400Kg/m3 for the beam seat, slab and kerbs

307

Transitional Slab( 1mx0.1x8)cm length on both sides of the bridge

308

Archor of rods HA25 to a rock

309

Drainage material behind the abutment

 

Total Fondations- abutments- deck- wing wall

 

Series 400 - EQUIPMENT

401

Mix guard rails (concrete pillars and metallic pipes)

402

weep holes in PVC

403

Drainage pipes (PVC 100)

404

Metallic project information sign posts (type AB)

405

Round post markers (Balises) in treated Eucalyptus well seasoned wood

 

Total Equipment

 

3. CONSTRUCTION OF A 3X3X9 REINFORCED CONCRETE  BRIDGE LINKING BAPTIST TO CATHOLIC CHURCH BUJONG QUARTER IN BAMENDA I SUBDIVISION, MEZAM DIVISION OF THE NORTH WEST REGION.

 

Series 100-Preparatory works

101

Site installation (construction site hut, mobilisation, Etc...)

102

Geotechnical studies

103

Execution Program and as built plan

 

Total installation

 

Series 200: Site preparation

201

Bush clearing

203

Cleaning of the river bed

204

Setting out of the structure

 

Total Site preparation

 

Series 300: Earth works

 

Opening of 2km road on both side of the bridge

301

Excavation in ordinary terrain

302

Drainage material behind the abutmments

303

Backfilling of the excavation

304

Fill and resurfacing of the accesses to the bridge 300m on both side

 

Total Earth works

 

Series 400 - Fondations- abutments- Piles- beams-deck

401

Hard core

402

Demolition

403

Lean concrete  dosed at 150Kg/m3

404

Reinforced concrete box culvert of 3m x3m x9m 

405

construction of stone masonry v gutters 135x65cm

 

LOT 2 : CONSTRUCTION OF THREE BRIDGES IN BAMENDA II

1.    CONSTRUCTION OF  A REINFORCED CONCRETE   LINKING NDZEMAMBEAH - NTANKAH 08M SPAN

 

S/No

DESCRIPTION

 

 

Series 000-Installation

 

1

Site installations

 

2

mobilisation and demobilisation of equipment

 

3

Work execution program and as built plan

 

4

Geotechnical studies (evironmental studies inclusive)

 

 

Total installation

 

 

Series 100: Site preparation

 

101

Site clearance

 

102

Traffic flow (diversion of water course/road)

 

103

Setting out of the bridge

 

 

Total Site preparation

 

 

Series 200: General Earth works

 

201

Excavation of trenches

 

202

Backfilling of excavation

 

203

Resurfacing of the filled accesses to the bridge with laterite from borrowed pit 1KM on both side

 

 

Total General Earth works

 

 

Series 300 -FOUNDATION- ABUTMENT- DECK- WING WALL-GUTTERS

 

301

Hard core

 

302

Lean concrete  dosed at 150Kg/m3

 

303

Reinforced  concrete  dosed at 350Kg/m3 for the footings

 

304

reinforce concrete 15cm thick  dosed at 350Kg/m3 for the bridge's raft

 

305

Reinforced concrete  dosed at 400Kg/m3 for abutment and wing walls

 

306

Reinforced concrete  dosed at 400Kg/m3 for the beam seat, slab and kerbs

 

307

Transitional Slab on both sides of the bridge

 

308

Archor of rods HA25 to a rock

 

309

Drainage material behind the abutment

 

310

Construction of stone trapezoidal gutters of 100x70x30m

 

 

Total Fondations- abutments- deck- wing wall

 

 

Series 400 - EQUIPMENT

 

401

Mix guard rails (concrete pillars and metallic pipes)

 

402

weep holes in PVC

 

403

Drainage pipes (PVC 100)

 

404

Metallic project information sign posts (type AB)

 

405

Round post markers (Balises) in treated Eucalyptus well seasoned wood

2.    CONSTRUCTION OF A  7ML BRIDGE LINKING MBINFIBIEH -AKOKIKANG QUATER  IN BAMENDA II COUNCIL AREA

S/No

DESCRIPTION

 

Series 000-Installation

1

Site installations

2

mobilisation and demobilisation of equipment

3

Work execution program and as built plan

4

Geotechnical studies (evironmental studies inclusive)

 

Total installation

 

Series 100: Site preparation

101

Site clearance

102

Traffic flow (diversion of water course/road)

103

Setting out of the bridge

 

Total Site preparation

 

Series 200: General Earth works

201

Excavation of trenches

202

Backfilling of excavation

203

Resurfacing of the filled accesses to the bridge with laterite from borrowed pit

 

Total General Earth works

 

Series 300 -FOUNDATION- ABUTMENT- DECK- WING WALL-GUTTERS

301

Hard core

302

Lean concrete  dosed at 150Kg/m3

303

Reinforced  concrete  dosed at 350Kg/m3 for the footings

304

reinforce concrete 15cm thick  dosed at 350Kg/m3 for the bridge's raft

305

Reinforced concrete  dosed at 400Kg/m3 for abutment and wing walls

306

Reinforced concrete  dosed at 400Kg/m3 for the beam seat, slab and kerbs

307

Transitional Slab on both sides of the bridge

308

Archor of rods HA25 to a rock

309

Drainage material behind the abutment

 

Total Fondations- abutments- deck- wing wall

 

Series 400 - EQUIPMENT

401

Mix guard rails (concrete pillars and metallic pipes)

402

weep holes in PVC

403

Drainage pipes (PVC 100)

404

Metallic project information sign posts (type AB)

405

Round post markers (Balises) in treated Eucalyptus well seasoned wood

3.    CONSTRUCTION OF A 3.5x4x8M REINFORCED CONCRETE  BOX CULVERT LINKING NDZEMAMBEAH - ALAMATU IN BAMENDA II COUNCIL AREA

S/No

Description

 

Series 100-Preparatory works

101

Site installation (construction site hut, mobilisation, Etc...)

102

Geotechnical studies

103

Execution Program and as built plan

 

Total installation

 

Series 200: Site preparation

201

Bush clearing

202

Maintainance of trafic flow

203

Cleaning of the river bed

204

Setting out of the structure

 

Total Site preparation

 

Series 300: Earth works

301

Excavation in ordinary terrain

302

Drainage material behind the abutmments

303

Backfilling of the excavation

304

Fill and resurfacing of the accesses to the bridge 600m on both side

 

Total Earth works

 

Series 400 - Fondations- abutments- Piles- beams-deck

401

Hard core

402

Demolition

403

Lean concrete  dosed at 150Kg/m3

404

Reinforced concrete box culvert of 3.5m x4m x8m 

405

Reinforced concrete dose at 400kg/m3 for the 4 heads

406

Construction of stone trapezoidal gutters of 100x70x30m

 

Total Fondations- abutments- Piles- beams-deck

 

Series 500 - Paint

 

Series 500 - Equipment

501

Metallic guard rails

502

Triangular sign posts type A ou AB

503

Wooden post markers

504

Drainage pipes

 

Total Equipment

1.      Tranches/Allotment:

The works are presented in TWO(02) lots and enterprises will submit bids for just one lot .

2.   Estimated Cost :

Project Name

Type  of Structure

Span (lm)

Estimated Cost including (TTC) in Fcfa

LOT 1

·   A : 8ML BRIDGE AT BANGSHIE (KENELAR BRIDGE) AND OPENING OF 2KM ACESS ROAD ON BOTHSIDES,

·   A 3X3X9ML BOX  CULVERT AT  BAPTIST CHURCH AKUMBELE TO CATHOLIC CHURCH BUJONG AND OPENING OF 2KM ACESS ROAD ,

·   A 6 ML BANGSHIE BRIDGE  AND OPENING OF ACESS WAY IN BAMENDA I COUNCIL AREA

 

 

Bridge

Varied according to area

245,610,000

LOT 02

·      A 08 ML BRIDGE (LINKING NDZEMANBEAH TO NTANKAH

·       A REINFORCED CONCRETE   BOX CULVERT OF 3.5M X4M X8M   LINKING NDZEMANBEAH TO ALAMATU AND

·      A 7ML BRIDGE LINKING MBINFIBIEH -AKOKIKANG QUATER IN BAMENDA II COUNCIL AREA.

 

 

Bridge                                                                                                                                           

Varied according to area

245,610,000

 

The estimated cost of the operation following preliminary studies is Four Hundred and ninety one million two hundred and twenty thousand (491 220 000) Francs CFA all taxes included.

 

3.Cout Prévisionnel New(Additif)

Project Name

Type  of Structure

Span (lm)

Estimated Cost including (TTC) in Fcfa

LOT 1

·   A : 8ML BRIDGE AT BANGSHIE (KENELAR BRIDGE) AND OPENING OF 2KM ACESS ROAD ON BOTHSIDES,

·   A 3X3X9ML BOX  CULVERT AT  BAPTIST CHURCH AKUMBELE TO CATHOLIC CHURCH BUJONG AND OPENING OF 2KM ACESS ROAD ,

·   A 6 ML BANGSHIE BRIDGE  AND OPENING OF ACESS WAY IN BAMENDA I COUNCIL AREA

 

 

Bridge

Varied according to area

245,610,000

LOT 02

·      A 08 ML BRIDGE (LINKING NDZEMANBEAH TO NTANKAH

·       A REINFORCED CONCRETE   BOX CULVERT OF 3.5M X4M X8M   LINKING NDZEMANBEAH TO ALAMATU AND

·      A 7ML BRIDGE LINKING MBINFIBIEH -AKOKIKANG QUATER IN BAMENDA II COUNCIL AREA.

 

 

Bridge                                                                                                                                           

Varied according to area

245,610,000

4.Allotissement New(Additif)

2 LOTS

5.Participation et origine New(Additif)

Participation in this invitation to tender is open to all registered, categorised and qualified companies or groups of companies based in the Republic of Cameroon.

6.Financement New(Additif)

The Works on this tender are funded by the budget of the 2026 MINTP BUDGET AND BEYOND , The previewed cost of the entire works of this Open National Invitation to tender is: Four  Hundred and ninety one Million  two hundred and twenty thousand (491 220 000) Francs CFa all taxes included.

7.Consultation du Dossier New(Additif)

The hard copy of the file may be consulted free of charge during working hours in the services of the Delegated Contracting Authority -  the office of the Governor of the Northwest region premises as soon as this notice is published. It may equally be consulted online on the COLEPS platform at the following addresses: http://www.marchespublics.cm and http://www.publiccontracts.cm on the ARMP website (www.armp.cm)

8.Acquisition du Dossier New(Additif)

This receipt should be able to identify the buyer as the representative of the bidder, wishing to participate in the consultation.  

 The hard copy of the Tender file may be obtained from the office of the Governor of the Northwest region premises as soon as this notice is published against payment of a non-refundable sum of One Hundred and thirty six Thousand (136,000) Francs CFA , payable at the Regional Treasury.

During the acquisition of the tender file, the bidder will fill in the register indicating his complete address (PO Box, Telephone number, fax, Email).

It is equally possible to obtain the electronic version of the Tender File by downloading it free of charge through the addresses indicated above. However, online submission is subject to the payment of Tender File purchase fees. 

9.Remises des offres New(Additif)

Each offer drafted in English or French will be submitted online in the MINMAP/COLEPS platform www.publiccontracts.com not later than_____/_____/2026 at 11 AM local time. A backup copy of the Tender saved in a USB key or a CD/DVD must be sent in a sealed envelope with a clear and legible indication “backup copy” within the time limit and should carry the inscription

 

 

N°…….../ONIT/NWRTB/GOV-NW/2026 OF ……. /……. /2026 FOR THE CONSTRUCTION OF SOME BRIDGES IN BAMENDA 1 AND 2 IN TWO LOTS

BY EMERGENCY PROCEDURE LOT 01(CONSTRUCTION OF THREE BRIDGES )A : 8ML BRIDGE AT BANGSHIE (KENELAR BRIDGE) AND OPENING OF 2KM ACCESS ROAD ON BOTHSIDES,  A 3X3X9ML BOX  CULVERT AT  BAPTIST CHURCH AKUMBELE TO CATHOLIC CHURCH BUJONG AND OPENING OF 2KM ACCESS ROAD ,6 ML BANGSHIEBRIDGE  AND OPENING OF ACESS WAY IN BAMENDA I COUNCIL AREA

 To be opened only during session

<>

N°…….../ONIT/NWRTB/GOV-NW/2026 OF ……. /……. /2026 FOR THE  CONSTRUCTION OF SOME BRIDGES IN BAMENDA 1 AND 2 IN TWO LOTS

BY EMERGENCY PROCEDURE LOT 2 (CONSTRUCTION OF THREE BRIDGES) A 08 ML BRIDGE (LINKING NDZEMANBEAH TO NTANKAH AND A REINFORCED CONCRETE   BOX CULVERT OF 3.5M X4M X8M   LINKING NDZEMANBEAH TO ALAMATU AND A 7ML BRIDGE LINKING MBINFIBIEH -AKOKIKANG QUATER IN BAMENDA II COUNCIL AREA.

To be opened only during session

<>

Size and Format of Files

The maximum size of the different volumes cited above (Volume 1, Volume 2 and Volume 3) or the files to transmit through the platform and make up the tender file of the bidder are as follows:

·         5MB for Administrative documents(Volume 1)

·         15MB for Technical offer(Volume 2)

·         5MB for Financial documents(Volume 3)

The accepted formats are the following:

·         PDF Format for documents

·         JPEG for images

The bidder will have to use compression software to reduce the sizes of each volume to fall in line with the specifications.

10.Delai de Livraison New(Additif)

 The maximum time frame provided for by the Delegated Project Owner for the execution of works subject of this open national invitation to tender is Five (05) calendar months. This time frame shall run from the date of notification of the administrative order to commence the services.

11.Cautionnement Provisoire New(Additif)

Each bidder must include in his administrative documents, a bid bond in line with the prescription of Caisse des Depots et Consignations (CDEC) approved by the Ministry in charge of finance and whose list is found in this Consultation File,  and valid for ninety (90) days beyond the date of validity of bids. The amount of the bid bond is indicated in the table below:

 

No

Amount in Figures(FCFA)

Amount in Words(FCFA)

Lot 01

4,912,200

Four million nine hundred and twelve thousand two hundred.

Lot 02

4.912,200

Four million nine hundred and twelve thousand two hundred

 

To avoid reject, the bid bond has to be an original copy which is less than three months.

The bid bond will released for unsuccessful bidders once the publication of the award is done.In case the bidder is attributed the contract, the bid bond will be released only when the final bond has been produced. Bank cheques(even certified) will not be accepted in place of the bid bond. The Bid bond will be validated by a receipt of deposit at CDEC.

 

12.Recevabilité des Offres New(Additif)

Bids that will be submitted after the date and time mentioned above or those that will not respect the separation model indicated in the different documents in each bid shall not be accepted.

All the bids that are not conform to the prescriptions of this tender file shall not be accepted.

The absence of the stamped bid bond drawn up using the model proposed in the tender file and issued by a bank or an insurance company accredited to issue bonds within the framework of public contracts, valid within Ninety (90) days.

To avoid being rejected, the required Administrative documents will be imperatively produced in original or in certified true copies by the issuing service, in conformity with the stipulation of the rules and regulations of this tender.

These Administrative documents have a validity period of three (03) months. This validity period has to begin after the date of the launching of the tender.

13.Ouverture des Plis New(Additif)

The bids shall be opened in a single phase. The opening of the administrative documents, the Technical and Financial offers will take place online in the MINMAP/COLEPS platform www.publiccontracts.com on the_____/______/2026 at 12 noon local time, in the conference hall of the Regional Tenders’ Board, by its competent Members. Only bidders may attend or be represented by duly mandated persons of their choice who has a perfect mastery of the tender file. The bids will be evaluated exclusively of value added tax (EVAT) and all taxes inclusive (ATI) and accompanied by a signed model submission

 

To avoid being rejected, the required Administrative documents will be imperatively produced in original or in certified true copies by the issuing service, in conformity with the stipulation of the rules and regulations of this tender. These Administrative documents have a validity period of three (03) months. This validity period has to begin after the date of the launching of the tender.

In case of absence or non-conformity of an administrative document during the opening session, after a deadline of 48 hours given by the commission, the offer will be rejected.

14.Critères d'évaluation New(Additif)

ELIMINATORY CRITERIA:

A-Administrative Documents

a)   Absence during bid opening session the original copy of bid bond issued by a first-class financial organisation authorized by the Ministry of Finance to issue Bid Bonds within the framework of public Contracts;

b)   Non-conformity after a period of 48 hours following the deposit of bids, of at least one Administrative document;

B-Technical Documents

a)   Absence of the declaration by the bidder attesting that the latter has not abandoned any contract within the last three (03) years, and that he does not future in in the list of non-performant companies established by MINMAP.

b)   Absence of integrity chart dated and signed.

c)    Absence of declaration on the engagement to respect environmental clauses;

d)   Absence of financial capacity drafted with respect to the COBAC model issued by first class bank approved by the Minister of Finance;

No

Amount in figures Fcfa

Amount in Words Fcfa

1

150,000,000

One hundred and fifty Million

 

e)   Did not validate 2/3 of the essential criteria and obligatorily the equipment criteria;

f)     Did not have the minimum required equipment

·         An excavator

·         A dump Truck

·         Two(02) concrete Mixers

·         Two(02) concrete Vibrators

·         Two(02) motor pumps

·         Two(02) manual compactors

·         A Pick Up 4 x 4

g)   Absence of attestation of site visit dated, stamped and signed by the bidder;

h)   Absence of categorization certificate issued by MINMAP

i)     Proof of acceptance of clauses within the contract

C-Incomplete financial bid for absence of one of the following documents:

a)    Unit Price breakdown non-conform with that of the tender file ;

b)    The unit price schedule non-conform with that of the tender file;

c)    Absence of a quantified price in the financial offer;

d)    Absence of an element in the financial offer(the tender letter, the Unit Price Schedule, the Bill of Quantities and cost Estimates.

D-General Eliminatory Criteria:

a)   Absence of the soft copy of the bid or non -respect of the format for the files

b)   Absence of original copy of bid bond

c)    False declaration, falsified documents or non authentic, fraudulent practices

d)   Using COLEPS certificate of another Enterprise to submit

17-2 : Essential criteria :

The technical bids will be evaluated according to the following ten (10) main criteria:

a.      Key personnel of the enterprise on three (03) criteria ;

b.     The site equipment to be mobilized on five (05) criteria ;

c.      The Enterprise references on two (02) criteria.

NB: A civil servant without any justification of secondment from the public service will not be evaluated;

15.Attribution New(Additif)

The contract will be awarded to the lowest bidder, fulfilling the required administrative, technical, and financial criteria.

The Delegated Contracting Authority has the discretion not to award the contract to a bidder who has an ongoing contract within the zone, having non satisfactory performances (cancelled or abandoned) or a bit satisfactory (Formal notice with evaluation being unsatisfactory or a notified evaluation of non-compliance within six months of award or contract cancellation underway).

16.Durée Validité des Offres New(Additif)

The bidders remain engaged to their offer within Ninety (90) days from the submission date of the bids.

17.Renseignements Complémentaires New(Additif)

Additional information in relation to technical details can be obtained at the office of the Delegated Contracting Authority, notably The Governor of the North West Region.

22.  Fight against Corruption and Malpractices