DÉLÉGUÉ RÉGIONAL DU MINMAP DU SUD OUEST
FOR THE REHABILITATION OPENING OF THE RURAL ROAD IKOTI -MOKANGO- MOFAKO IN NDIAN DIVISION SOUTH WEST REGION( 2017 financial year)
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

VVithin the frarnework of the Public Investment Budget 2017, the South West RegionalDelegate of Public Contracts, hereby launches an Invitation to Tender (By mutual agreement procedure) for the reha-bilitation of the priority rural road Ikoti — Mokango — Motako in Ndian Division, south west region (2017 financial year).

2.Consistance des prestations New(Additif)

The works comprise the follc.ming:

Bush clearing :

Tree fellina :

_ • Cut and spoil

Road prohling

Cleaning of drainage structures;

Putting in place of drainage structures with associated structures (metallic ring culverts, box

culverts, culvert heads and collection chambers);

Creation of eitches and footshots,

Cleaning of ditches

Bulldozing (opening)

3.Cout Prévisionnel New(Additif)

The estimated cost aller preliminary studies is One hundred and thirty Pive million (135 000 000) FCFA.

4.Participation et origine New(Additif)

The tender is open to duly legalized Cameroonian enterprises that fulfill the requirements of this invitation to tender

5.Financement New(Additif)

Works of this invitation Io tender shall be financed by Public Inveslment Budget of the 2017 financial year.

6.Consultation du Dossier New(Additif)

Further information may obtain during working hours as from the date of publication uf this tender notice, at the Regional Delegation of Public Contracts for the South West Region - Buea,Tel' 33 32 32 39 / 33 32 32 45

7.Acquisition du Dossier New(Additif)

The complete tender file rnay be obtained trorn the Regional Delegation of Public Contracts Buea,room 08, upon presentation of a treasury roceipt attesting ta the payment of a non-refundable sum ofOne Hundred and ten thousand(110,000) FCFA

8.Remises des offres New(Additif)

Each bid drafted in Euglish or French in Seven (07) copies including one (01) original and six(06)copies marked as such should reach the Regionaf Delegatien of Public Contracts for the South West B uea not later than 13 NOV 2017 at 9 am local time in three (0) distinct envelops which shall be labelled follows:

9.Delai de Livraison New(Additif)

The maximum penod provicied for the execution of the works is fixed at five (05) months

10.Cautionnement Provisoire New(Additif)

The bidder must include in his/her administrative documents, a bid bond issuod by a first rate bank approved by the Ministry in charge of Finance and re.cognizeci by COBAC (Commission Bancaire pour l'Afrique Centrale) featuring on the list Document 12 of the tender file of an amount of: Two million seven.

11.Recevabilité des Offres New(Additif)

Each bid drafted in Euglish or French in Seven (07) copies including one (01) original and six(06)copies marked as such should reach the Regionaf Delegatien of Public Contracts for the South West B uea not later than 13 NOV 2017 at 9 am local time in three (0) distinct envelops which shall be labelled follows:

 

12.Ouverture des Plis New(Additif)

The bids shall be opened in a single( 011 phase. The opening of administrative documents, the technical and financial offers on   1 3 Nov 2017  at 10 a.m. prompt local time by the South West regional T enders' Boardsituated al the Conference Hallof the Regional Delegation of MINMAP, in the MINE-PAT Building.

Only bidders rnay attend or be represented by a duly mandated person.

13.Critères d'évaluation New(Additif)

False deciaration or forged document,

Absence of bid bond,

  • Absence of an administrative document,
  • A technical score boss than 70%

        • Absence of quantified unit price

 

ii) Essential Criteria:

Indicatively, the criteria relating to the qualification of candidates will be on: -General Presentation, compliance with the model bid

-  Methodological approach and relevance of proposed solutions;

-  References of the bidder (experience of at least three (03) simifar works)(attach proof)

-  Availability of material and essential equipment

-  VVork supervisor: A Civil Enginser with at leasl five (05) years of experience fulfilling the conditions of his field of competence.

- Site foreman: At least a civil engineering senior technician or equivalent with at least five (05) years ex in the domain of road maintenance or a civil Engineer with at least three (03)  years'  experience in the domain.of road maintenance.                             . _

-  Turnover, Financial capacity, Access to credit or other financial sources, fifty millions (50 000 000 FCFA);

 -Deadline for execution the non-respect of 70% criteria shall cause the elimination of the bid

-           Deadltne for exectition.

  • · -

 

14.Attribution New(Additif)

The contract shah be awarded to the bidder with the least financial offer having the technical and administrative files which are in conformity with the tender document/file.

15.Durée Validité des Offres New(Additif)

Bidders shall be dound by their bids for a period of ninety (90) days from the deadline set for the opening of bids.

16.Renseignements Complémentaires New(Additif)

Complementary technical information may be obtained during working hours from the Regional Delegation OF pUBLIC cONTRACTS sOUTH wEST rEGION tEL  233 32 32 39// 233 32 32 45

BUEA Le 17-10-2017
Le DÉLÉGUÉ RÉGIONAL
KATI ALFRED NJILGTI