Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 01-02-2018 à 16:43
Support : support@armp.cm Plateforme : pridesoft@armp.cm
DÉLÉGUÉ DÉPARTEMENTAL DU MINMAP DE MOMO
OPEN NATIONAL INVITATION TO TENDER, EMERGENCY PROCEDUREN°04/ONIT/MINMAP/RDNW/DDMOMO/DTB/2018 OF 30/01/2018FOR THE CONSTRUCTION OF A BLOCK OF TWO CLASSROOMS IN GSNKON-MENGOM AND GS TUANYANG, MOMO DIVISION, NORTH-WESTREGION.
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

The Divisional Delegate of Public Contracts for MOMO, the Contracting Authority, on behalf of the Republic of Cameroon, hereby launches an open invitation to tender, emergency procedure for the construction of a block of two classrooms in GS NKON-MENGOM AND GS TUANYANG, MOMO Division, North West Region divided in to two lots.

 

2.Consistance des prestations New(Additif)

The works include the following:
Lot 100: Preparatory works ;
Lot 200: Earth works ;
Lot 300: Foundation;
Lot 400: Masonry elevation ;
Lot 500: Carpentry-roofworks;
Lot 600: Metallic works ;
Lot 700: Electricity works ;
Lot 800: Painting;
Lot 900: Surface drainage.

3.Cout Prévisionnel New(Additif)
Lot Name of Project Amount of project Amount of bid bond Coct of tender file
1 GS NKON-MENGOM 18 000 OOO F CFA 360 OOO F CFA 34 000 FCFA
2 GS TUANYANG 18 000 OOO F CFA 360 OOO F CFA
4.Allotissement New(Additif)

Works are divided into two lots as follows:

> LOT N° 1: Construction ofa block oftwo classrooms at GS NKON-MENGOMin ANDEK NGIE COUNCIL Council Area,
> LOT N° 2: Construction of ablock of two classrooms at GS TUANYANG in MBENGWI COUNCIL Council Area.

NB: Bidder can only be awarded one lot.

5.Participation et origine New(Additif)

 

Participation is open under the same conditions to all Cameroonian companies and business concerned that have proven experience in the field of building construction and civil engineering in general.

6.Financement New(Additif)

 

The works, subject of this invitation to tender, shall be financed by the Public Investments Budget MINEDUB 2018.

7.Consultation du Dossier New(Additif)

 

The tender file maybe consulted at the Divisional Delegation of Public Contracts for MOMO during working hours, as soon as this tender notice is published.

8.Acquisition du Dossier New(Additif)

 

The tender file maybe acquired from the Divisional Delegation of Public Contracts for MOMO upon presentation of a non refundable treasury receipt of 34 000 (thirty four thousand) FCFA. Such a receipt shall identify the payer as representing the company that wants to participate in the tender.

9.Remises des offres New(Additif)

Each offer or bid drafted in English or French in seven(07) copies including the original and six (06) copies marked as such in accordance with the prescriptions of the tender files hould be
submitted against a receipt at the Divisional Delegation of Public Contracts MOMO not later than 20/02/2018 at 10 a.m local time and should carry the inscription:


"Open National Invitation to Tender, Emergency Procedure"
N°04/ONIT/MINMAP/RDNW/DDMOMO/DTB/2017 of 30/01/2018
For the construction of a block of two classrooms in GS NKON-MENGOMAND GS TVANYANG, MOMO Division, North-West Region. Lot N°...

«To be opened only during the bid opening session »

The offers or the bids submitted after the stipulated deadline shall not be received.

10.Delai de Livraison New(Additif)

 

The maximum execution deadline shall be three (03) calender months, including the rainy season and other vagaries, with effect from the date of notification of the administrative order of work commencement.

11.Cautionnement Provisoire New(Additif)

Each bidder must include in his administrative documents a bid bond issued by a first rate bank approved by the Ministry in charge of Finance featuring in the annex of the tender file of the sum of 360 000 ( Three hundred and sixty thousand) FCFA per lot.

The provisional deposit shall be automatically released not later than 30 (thirty) days following the expiry of the validity of the bids for bidders who shall not be retained. In the case where the bidder is awarded the contract, the provisional deposit shall be released after the constitution of the final bond.

12.Recevabilité des Offres New(Additif)

The tender file in three (03) volumes shall be enclosed in three sealed envelopes.
> Envelope A containing the administrative documents (Volume 1);
> Envelope B containing the technical offer (Volume 2);
> Envelope C containing thefinancial offer (Volume 3).

The three volumes shall then be enclosed in a single sealed  envelope bearing only the reference of the tender in question. The different documents of each offer shall be numbered as indicated in the tender and separated by dividers of the same colour.

The bids not respecting the separation mode of the financial bid from the administrative and technical bids shall be rejected.
Any bid not inconformity with the prescription of this tender notice and tender file shall be declared inadmissible. Especially the absence of a bid bond of a first rate bank approved by the
Ministry of Finance and valid for a period of thirty(30) days shall be rejected.
Least they are rejected, only the originals or certified true copies by the issuing service or administrative authorities of the administrative documents are accepted. They must obligatorily not be older than three (03) months and must be valid during the bid opening session.

13.Ouverture des Plis New(Additif)

 

 Thursday 22/02/2018

14.Critères d'évaluation New(Additif)

1-Eliminatory criteria

1-1- Administrative documents
• Any offer not in conformity with the prescriptions of this tender file shall be declared inadmissible. Especially the lack of the provisional guarantee;
• Absence of a document in the administrative file;
• Any company having a 2017 project, notified to commence in 2017 and which has not yet been received;
• False declaration or falsified documents.
1-2- Technical file
• Incomplete or non compliant documents;
•False declaration forgedor scanned documents;
• Non existence in the technical file of the rubric « organization, methodology and planning »
• Absence of the prefinancing capacity of at least Four millions, fivehundred thousand (4 500 000) F CFA,
•Any company having a 2017 project, notified to commence in 2017 and which has not yet been received;                                • Technical assessment mark lower than 80% of "Yes".
1.3- Financial offer
• Incomplete financial offer;
• Non compliant documents;                                                        • Omission ofquantified unit price in the financial offer;
• Absence of break down price.
• Modification of the model break down unit price attached.
2-Essential criteria:

The technical offer of bidder shall be assessed along the following lines:

 

S/N Designation Marks
01 General Presentation of the offer: Document spirally bound, colour sheets separation, table of content, presentation of documents in the order given in this tender file, quality of document 01
02 Quality of Requested staff: Qualifications,experience of personnel affected to the project, CV, NIC and  attestation of availability. 05
03 Technical and material affected to the project: The company should justify the property of the necessary material to the execution of works. 01
04 Reference of the enterprise: " Turnover in the past two years;
• Experience in building and/or civil engineering works
02
05 Presence of the methodology of work execution 05
06 Presence of the prefinancing capacity 01
 

 The note of the technical offer will be botten by addition of marks for every criteria. Only the technical offer having gotten an equal or superior note to 80% of YES will be kept for the financial evaluation.

 
15.Attribution New(Additif)

 

The jobbing order shall be awarded to the bidder whose bid is in conformity to the dispositions of the tender file and on the basis of the lowest bid and technical quality. (See article 33 of the Public Contracts Code).

16.Durée Validité des Offres New(Additif)

 

The bidders shall remain committed to their bids during a period of (ninety) 90 days from the deadline set for the submission of bids.

17.Renseignements Complémentaires New(Additif)

 

Complementary technical information may be obtained every day during working hours from the Divisional Delegation of Public Contracts MOMO.

BAMENDA Le 30-01-2018
Le DÉLÉGUÉ DÉPARTEMENTAL
NDANGANG DAVID NUMFOR