Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 22-03-2018 à 14:25
Support : support@armp.cm Plateforme : pridesoft@armp.cm
COMMUNE D'ALOU
001/ONIT/ASD/AC/ACTB/2018 OF 07/03/2018 FOR THE CONSTRUCTION OF THE NDUNGALLAH NDUNGATETE WATER PROJECT- IN ALOU SUB DIVISION- IN ALOU SUB DIVISION
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the frame-work of the 2018 Public lnvestment Budget (PIB 2018), the Delegated Contracting
Authority (THE LORD MAYOR ALOU) hereby representing the State of Cameroon, launches an Open
National Invitation to tender under conditions of emergency for THE CONSTRUCTION OF THE
NDUNGALLAH NDUNGATETE WATER PROJECT- IN ALOU SUB DIVISION‑

LEBIALEM DIVISION

in Lebialem Division in the South West Region.

2.Consistance des prestations New(Additif)

The works subject of this invitation to tender shall require THE CONSTRUCTION OF THE NDUNGALLAH NDUNGATETE WATER PROJECT- IN ALOU SUB DIVISION-,Lebialem Division in the South West Region. The works and service required are found in the detail description mentioned in the respective bills of quantities and cost estimates.

3.Cout Prévisionnel New(Additif)

The estimated cost of the operations (tasks) following feasibility studies stands as specified in the table below:-

Lot :

N% orks

Locality

Estimated Cost

1

THE     CONSTRUCTION       OF      THE

NDUNGALLAH-
NDUNGATETE

15,000.000
FCFA

NDUNGALLAH NDUNGATETE WATER

PROJECT- IN ALOU SUB DIVISION

4.Allotissement New(Additif)

The works subject of this invitation to tender shah in one lot defined with specifications as in the table below--

Lot

Works

Locality

1

THE CONSTRUCTION OF THE NDUNGALLAH
NDUNGATETE WATER PROJECT- IN ALOU SUB
DIVISION-LEBIALEM DIVISION

NDUNGALLAH-NDUNGATETE

5.Participation et origine New(Additif)

Participation in this invitation to tender is open to al' reg is companies based in the Republic of Cameroon with the requir domainof construction accompanied by the necessary financial capability.

6.Financement New(Additif)

Works which form the subject of this invitation to ten budget head of the 2018 Public Investment Budget (PIB 2018) the table below:-

Lot

Ministry

Project
Owner

Works

Provisional
Amount

Vote of charge N°

Expenditure
authorization

 

Agriculture
and Rural
Development

The Mayor Alou council

THE    CONSTRUCTION

15,000,000
FCFA

IT03417

5230393026

4190428119

21

OF THE NDUNGALLAH

1

NDUNGATETE UNGATETE WATER

PROJECT-   IN     ALOU

SUB DIVISION

7.Consultation du Dossier New(Additif)

The Tender documents may be consulted immediately after publication of this invitation to tender from the Alou Council tender board or Divisional Delegation (Service in charge of the contracts award) during working hours at the Alou Council.

8.Acquisition du Dossier New(Additif)

The Tender documents shah be obtained immediately after publication of this invitation to tender from the Services of the Contracting Authority (Service in charge of contracts award) during working hours at the Alou Council. The document shall be obtained upon presentation of a municipal treasury receipt showing the payment of a non-refundable sum of thirty thousand (30,000) F CFA.

9.Remises des offres New(Additif)

Each offer written in English or French shall be signed by the bidder or by a duly authorized Representative and presented in seven (7) copies, that is one (01) original and six (06) copies labelled as such. These shall be submitted in one extemal sealed envelope containing three (3) envelopes, that is, Envelope A: Administrative Documents, Envelope B: Technical document and Envelope C: Financial document. It shah mach the Alou council tender board Service in charge of contracts award ,not later than 05/04/2018 at 9:30am local time. The sealed external envelope shah be free of all identification marks, failing which it shah be rejected.

The sealed external envelope addressed to the Delegated Contracting Authority shall bear the following inscriptions:

 

10.Delai de Livraison New(Additif)

The maximum execution deadline provided for by the Project Owner for the execution of the works subject of this tender shall be ninety calendar clays (three months) with effect from date of notification of the Service Order to start execution.

11.Cautionnement Provisoire New(Additif)

Each bidder shah enclose in his administrative documents a bid bond issued by a first rate bank approved by the Ministry in charge of Finance and that shah respect the mode! in this tender file featuring on the list in document 1 I of the tender file and valid for ninety (90) days beyond the original date of the validity of the offers.

Lot

Works

Locality

Estimated Cost

Bid Bond

Tender
Fee

Place of
payment

1

THE   CONSTRUCTION

NDUNGALLAH- NDUNGATETE

15,000,000
FCFA

300,000
FCFA

30,000
FCFA

ALOU
Council

OF THE NDUNGALLAH
NDUNGATETE WATER
PROJECT- IN ALOU SUB

DIVISION

12.Recevabilité des Offres New(Additif)

Each offer written in English or French shall be signed by the bidder or by a duly authorized Representative and presented in seven (7) copies, that is one (01) original and six (06) copies labelled as such. These shall be submitted in one extemal sealed envelope containing three (3) envelopes, that is, Envelope A: Administrative Documents, Envelope B: Technical document and Envelope C: Financial document. It shah mach the Alou council tender board Service in charge of contracts award ,not later than 05/04/2018 at 9:30am local time. The sealed external envelope shah be free of all identification marks, failing which it shah be rejected.

The sealed external envelope addressed to the Delegated Contracting Authority shall bear the following inscriptions:

OPEN NATIONAL INVITATION TO TENDER

N2 001/ON IT/AS D/AC/ACTB/2018 OF 07/03/2018 THE CONSTRUCTION OF THE NDUNGALLAH
NDUNGATETE WATER PROJECT- IN ALOU SUB DIVISION

13.Ouverture des Plis New(Additif)

Bids shall be opened by the Sub-Divisional Tenders Board for Alou Council a single phase on the 05/04/ 2018 at 10:30am local time in the Alou Council hall. Only bidders or their authorized representatives having a perfect knowledge of the file may attend the bid opening session. Note should be taken that in case of any ambiguities or differences during opening, only the original shall be considered authentic, that is, any

14.Critères d'évaluation New(Additif)

Tender conformity shall be evaluated as per the following:

A) Eliminatory Criteria.

Offers (bids) submitted alter the deadline or time limit; Bids submitted in unsealed externat envelopes. External envelopes with identification marks or inscri Absence of an original or properly certified admini than one time,

Non-compliance with model prescribed in the tender file; Absence of bid bond or bid bond not issued by a first of Finance

NB: Bid bond for a group of enterprises must be addressethn

t         with name of the other enterprises mentioned in its content.

Administrative documents more than 3months old;

None justification of capacity to pre-finance ;

False declaration or forged documents ;

Incomplete technical or financial documents;

- Technical evaluation mark less than 70% ;

Absence of quantified unit price ;

Financial offer more than the provisional amount of the project

B) Essential Criteria They are primordial or key modalities in the judgment of the technical and financial capacity of candidates to execute the tasks forming the subject of the invitation to tender. ,They were determined in relation to the nature and content of the tasks to be executed. Hence in the evaluation of:‑

(i) Technical documents, it shall be the binary method (YES or NO) based on the following distribution of points:

CRITERA

POINTS

GENERAL PRESENTATION OF THE BIDS

5

EXPERIENCE OF THE COMPANY

8

QUALITY OF PERSONNEL AND MANAGEMENT OF THE COMPANY

9

TECHNICAL EQUIPMENT

5

METHODOLOGY FOR THE EXECUTION OF WORKS

8

TOTAL

35

 

NB.

.Any Bid that shall not obtain 70% evaluation in the technical documents shall simply be rejected.

 

-Details of these main qualification criteria are specified in the evaluation grid found in the Special Tender Regulations (RPAO).

(ii) Financial Offer, it shall consist of going through the bill of quantities in reference to the unit price schedule and the sub detail of unit prices.

 

15.Attribution New(Additif)

The contract shah be awarded to the Iowest bidder who must have fulfilled the administrative, technical and financial requirements

16.Durée Validité des Offres New(Additif)

Bidders shah remain committed to their offers for ninety (90) days from the deadline set for the submission of tenders (offers).

17.Renseignements Complémentaires New(Additif)

The Pelegated Contracting Authority may at any time, amend this invitation to tender. Delays caused by such amendments shah also be considered in the period given to bidders to submit their bids.

The Pelegated Contracting Authority may at any time, amend this invitation to tender, while publishing the amendments and communicating them to companies that bought the tenders file. Delays caused by such amendments shah also be considered in the period given to bidders to submit their bids.

MENJI Le 07-03-2018
Le MAIRE
NTEMGWA Paul Sixtus